Laserfiche WebLink
Proposal Street Relocation <br /> September 11, 1992 <br /> Page Two <br /> • <br /> 3. Plat-area $4,500 <br /> (includes preliminary and final plat documents <br /> per City ordinance) <br /> 4. Topographic survey --- <br /> (included in item #1, above) <br /> 5. . Signal justification report --- <br /> (included in item #6, below) <br /> 6. Contract document $13,500 <br /> (includes record drawings when project is <br /> complete and a landscape plan) <br /> 7. Permits --- <br /> (included in item #6, above) <br /> 8. Construction estimating and bidding --- <br /> (included in item #9, below) <br /> 9. Contract administration and inspection $9,000 <br /> 10. Construction staking $3,000 <br /> Total (not to exceed) engineering cost $36,500 <br /> We have made the following assumptions in preparing this proposal: <br /> 1. No soil borings will be necessary. <br /> 2. Field construction testing _will be included in.the construction bid documents to be <br /> performed by the contractor. <br /> 3. No public meetings are included. However, informal meetings with staff and <br /> property owners is included (6 meetings-total). <br /> 4. Survey work will be completed prior to snow season. <br /> 5. Inspection is part time per our draft agreement for services. <br /> 6. . Costs are included to provide bomanite cross walk on Kenzie Terrace. <br /> 7. Pahl Avenue N.E., Coolidge St. N.E. and 27th Avenue N.E. are not proposed for <br /> overlay or reconstruction in the next 10 years per the Braun Intertec pavement <br /> management report, dated February, 1992. <br />