Laserfiche WebLink
CORNER LOTS <br /> CORNER LOTS <br /> Front footage equals the dimension <br /> of the sorter side plus one-third of AVENUE <br /> 160 a <br /> the long side if work is done on AUU&%KZ FRONT FOOTAGE• MR STREET <br /> both streets. If work is performed FRONT+1/3 TKE 910E YARD <br /> on the short side, front footage <br /> equals the short side. If work is 1.Work on Street "able rootage-90 ft. <br /> done on the long side, front footage <br /> equals one third of the long side. Z Work on Avenue: Assessable rootage.150/3-50 R <br /> See Figure 3. <br /> L Work on Street and Avenue <br /> Assessable rootage=90 t 150/3-190 R. <br /> Figure 3. <br /> CORNER LOTS ith curves <br /> CORNER LOTS WITH CURVES <br /> Front footage is determined for <br /> corner lots with curves as in corner AVENUE <br /> lots above but with 1/2 of the curve 95 ft 62.8 ft <br /> length applied to the short side of • <br /> the lot and 1/2 of the curve length TO h •' _ <br /> applied to the long side.'of the lot. <br /> See Figure 4. 35 ft 135 ft STREET <br /> • <br /> 1/2 of the curve Ia applied to the street <br /> and 1/2 the curve Is applied to the avenue <br /> Street length Is: 35 + 62.8/2 . 66.4 ft <br /> Avenue length Is: 95 + 62.8/2 0 126.4 R <br /> The comer lot assessment is then applied <br /> Figure 4. <br /> 4 <br />