Laserfiche WebLink
CHANGE ORDER <br /> N0 : Two 2 <br /> PROJECT: Water System Improvement DATE OF ISSUANCE: June 21, 1993 <br /> OWNER: St . Anthony Village <br /> (Name, 3301 Silver Lake Road <br /> Address) St . Anthony, MN 55418 OWNER'S PROJECT NO: 490-009-30 <br /> CONTRACTOR: Gridor Construction, Inc. ENGINEER: Maier Stewart & Assoc. <br /> 1886 Berkshire Lane 9800 Shelard Parkway <br /> Plymouth, MN 55441 Minneapolis, MN 55441 <br /> (612) 559-3734 (612) 546-0432 <br /> CONTRACT -FOR: ,Booster Pumps & ENGINEER'S PROJECT NO: 490-009-30 <br /> Pumphouse Installation <br /> You are directed to make the following changes in the Contract Documents: <br /> Description: Installation of limit switch control system, control panel <br /> modification, additional conduit. <br /> Purpose of Change Order: To provide system operator better <br /> information @ existing control panel . Modification will allow booster <br /> pumps to operate 'as a well from the existing well #7 control module <br /> in the existing filtration plant control panel . <br /> Attachments : Memorandum from Paul Kaeding dated June 14, 1993 . <br /> CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: <br /> Original .Contract Price Original Contract Time <br /> $162 , 043 . 00 June 15, 1993 <br /> day or date <br /> Previous C.O. ' s No. 1 Net change from previous <br /> Change Orders <br /> $ 2, 699 .50 3 days <br /> Contract Price prior to this C.O. Contract Time Prior to this C.O. <br /> $164 , 742 . 50 June 18, 1993 <br /> day or date <br /> Net Increase of this C.O. Net Increase of this C.O. - <br /> $943 . 84 14 days <br /> Contract Price with all Contract Time with all <br /> approved C.O. ' s approved C.O. ' s <br /> $165, 686 . 34 July 2, 1993 <br /> RECOMM LADED: APPROVED: APPROVED: <br /> by Q by by <br /> Engi eer Owner Contra for <br /> forms/ordcrAg <br />