My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 01101995
StAnthony
>
City Council
>
City Council Packets
>
1995
>
CC PACKET 01101995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:23:26 PM
Creation date
12/30/2015 6:23:11 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 01101995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of St. Anthony <br /> • Project Costs and Assessments <br /> RCM Project No. 10278.02 <br /> Table 1 <br /> Breakdown of Construction Costs <br /> Total Construction Cost = $659,709.90 <br /> Total Street Construction Costs = $440,373.90 <br /> Total Watermain Construction Costs = $163,891.20 <br /> Total Storm Sewer Construction Costs = $55,444.80 <br /> Table 2 <br /> Breakdown of Project Costs (including Engineering) <br /> Total Project Costs = $824,720.75 <br /> Total Street Project Costs $524,351.86 <br /> Total Watermain Project Costs = $195,115.39 <br /> Total Storm Sewer Project Costs = $66,146.65 <br /> Total Bonding Costs = $39,106.85 <br /> Table 3 <br /> Breakdown of Street Costs <br /> Total Assessable Footage for all Streets = 6,760.54 LF <br /> Total Street Project Cost (includes engineering, legal and admin.) $524,351.86 <br /> Assessable Amount (35%) $183,523.15 <br /> Assessable Bonding Cost $20,666.85 <br /> City Amount (65%) $340,828.71 <br /> Estimated Assessment Rate per Foot = $30.20 <br /> (including bonding costs, but does not include water service connection assessment) <br /> Table 4 <br /> Breakdown of Watermain Costs <br /> Total Watermain Project Cost (includes engineering, legal and admin.) $195,115.39 <br /> Assessable Amount ($400 per connection, 79 Connections) ($31,600.00) <br /> City Amount $163,515.39 <br /> Table 5 <br /> Breakdown of Total Estimated Project Costs <br /> Assessed Share (Streets, Water Connection and Bonding Costs) $235,790.00 <br /> City Share (Streets, Watermain and Bonding Costs) $522,784.10 <br /> Storm Sewer $66,146.65 <br /> Total Estimated Project Cost $824,720.75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.