Laserfiche WebLink
Page 2 <br /> Estimated <br /> Street "Watermaln Total <br /> Name Address PIN# Frontage Assessment Connection Assessment <br /> Jack Musikov&Wile 3004 Crestview Drive 06-029-23 43 0072 80.00 $2,416.25 $400.00 $2,816.25 <br /> William Wilson Jr. &Elizabeth Whisne -Wilson 3209 Bell Lane 06-029-23 43 0073 111.89 $3,379.43 $400.00 $3,779.43 <br /> Linda M.Vsetecka 3205 Bell Lane 06-029-23 43 0074 80.00 $2 416.25 $400.00 $2,816.25 <br /> Justin J.O'Connell et al. 3201 Bell Lane 06-029-23 43 0075 80.00 $2,416.25 $400.00 $2,816.25 <br /> A.&M. Boyum 3113 Bell Lane 06-029-23 43 0076 79.45 $2,399.64 $400.00 $2,799.64 <br /> Philip T. Resha etal. 3109 Bell Lane 06-029-23 43 0077 85.00 $2,567.27 $400.00 $2,967.27 <br /> Kenard V. Knutson et al. 3105 Bell Lane 06-029-23 43 0078 90.00 $2,718.29 $400.00 $5,118.29 <br /> David&Karen Ferguson 3101 Bell Lane 06-029-23 43 0079 124.85 $3,770.87 $400.00 $4.170.87 <br /> D.F.Anderson et al. 3001 Armour Terrace 06-029-23 43 0080 89.23 $2,695.03 $400.00 $3,095.03 <br /> John E. Lundgren et al. 3005 Armour Terrace 06-029-23 43 0081 105.40 $3,183.41 $400.00 $3,583.41 <br /> C.D.&S.S. Madhart 3101 Armour Terrace 06-029-23 43 0082 105.40 $3,183.41 $400.00 $3,583.41 <br /> Henry A.Jensen 3105 Armour Terrace 06-029-23 43 0083 105.40 $3,183.41 $400.00 $3,583.41 <br /> Eleanore J. Mudowski 3109 Armour Terrace 06-029-23 43 0084 78.54 $2,372.16 $400.00 $2,772.16 <br /> Wilfred A.Wahl 3113 Armour Terrace 06-029-23 43 0085 75.00 $2,265.24 $400.00 $2,665.24 <br /> R.M.&G.S. Loomis/Attn: Shirley Shapaka 225 N.Federal Hwy.Ste.400 <br /> Savings of America Pompano Beach FL 33062 06-029-23 43 0086 75.00 $2,265.24 $400.00 $2,665.24 <br /> Richard J.Sitarz&Wife 3205 Armour Terrace 06-029-23 43 0087 80.00 $2,416.25 $400.00 $2,816.25 <br /> Hugh&Susan McSherry 3024 Crestview Drive 06-029-23 43 0088 81.42 $2,459.14 $400.00 $2,859.14 <br /> Donald G. Brostrom et.al. 3020 Crestview Drive 06-029-23 43 0089 74.00 $2,235.04 400.001 $2,635.04 <br /> Roger L. Dickhausen et al. 3208 Armour Terrace 06-029-23 43 0090 111.89 $3,379.43 $400.00 $3779.43 <br /> Talivaldis Rudzitis et al. 3204 Armour Terrace 06-029-23 43 0091 80.00 $2,416.25 $400.00 $2,816.25 <br /> Michael&Donna En elme er 3200 Armour Terrace 06-029-23 43 0092 80.00 $2,416.25 $400.00 $2,816.25 <br /> Frank Plasek et al. 3112 Armour Terrace 06-029-23 43 0093 80.00 $2,416.25 $400.00 $2,816.25 <br /> L.H.Sallen et al./Charles Glotzbach 3108 Armour Terrace 06-029-23 43 0094 80.00 $2,416.25 $400.00 $2,816.25 <br /> Nicholas N.Yarr 3104 Armour Terrace 06-029-23 43 0095 75.00 $2,265.24 $400.00 $2,665.24 <br /> George Zahhos et al. 3100 Armour Terrace 06-029-23 43 0096 98.33 $2,969.88 $400.00 $3,369.88 <br /> B.J.Ostmoe/George Zahhos 3100 Armour Terrace 06-029-23 43 0097 83.70 $2,528.01 $400.00 $2,928.01 <br /> Harold Froehlich et al. 3016 Armour Terrace 06-029-23 43 0098 134.44 $4,060.51 $400.00 $4,460.51 <br /> Jack W. Lower Trust 3012 Armour Terrace 06-029-23 43 0099 99.41 $3,002.50 $400.00 $3,402.50 <br /> Donald L.Johnson et.al. 3008 Armour Terrace 06-029-23 43 0100 79.15 $2,390.58 $400.00 $2,790.58 <br /> L.G. &M.E. Ellis 3004 Armour Terrace 06-029-23 43 0101 79.40 $2,398.13 $400.00 $2,798.13 <br /> John H. Kohan Trustee 3000 Armour Terrace 06-029-23 43 0102 71.00 $2,144.43 $400.00 $2,544.43 <br /> Adam&Virginia Piecek 2930 Armour Terrace 06-029-23 43 0103 75.00 $2,265.24 $400.00 $2,665.24 <br /> Mary V. Farhet Trustee 2926 Armour Terrace 06-029-23 43 0104 75.00 $2,265.24 $400.00 $2,665.24 <br /> Donad R.&Camille M.Johnson 2922 Armour Terrace 06-029-23 43 0105 119.22 $3,600.82 $400.00 $4,000.82 <br /> Harold A. Fischer 2918 Armour Terrace 06-029-23 43 0106 155.82 ' $4,706.26 $400.00 $5,106.26 <br /> Bernard C.Bengtson et al. 2914 Armour Terrace 06-029-23 43 0107 30.47 $920.291 $400.001 $1,32029 <br /> Bemeice L. Babcock 2901 Crestview Drive 06-029-23 43 0128 44.54 $1 345.251 $400.001 $1,745.25 <br /> Total <br /> 6754.541 $204.008.541 $31,600.001 $235,608.54 <br /> Total Assessable Footage 6754.54 <br /> Total Assessable Bonding Costs $20,666.85 <br /> Total Assessable Street Cost $183,341.69 <br /> Total Assessable Street and Bonding Costs $204,008.54 <br /> Assessment per Foot of Frontage 30.20 <br /> Total Assessible Watermain Cost $31,600.00 <br /> Watermain Assessment per Connection $400.00 <br /> *Comer lots of connect to the new watermain and will not be charged for a connection. <br />