My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 06251996
StAnthony
>
City Council
>
City Council Packets
>
1996
>
CC PACKET 06251996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:29:34 PM
Creation date
12/30/2015 6:29:15 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 06251996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE OWNER ❑ <br /> ARCHITECT ❑ <br /> ORDER CONTRACTOR ❑ <br /> FIELD <br /> AIA DOCUMENT G701 OTHE ❑ <br /> OTHER ❑ <br /> PROJECT: ST.ANTHONY CITY HALL B COMMUNITY CTFL CHANGE ORDER NUMBER: 4 <br /> (name, address) SILVER LAKE RD.AT 33RD <br /> ST.ANTHONY,MN DATE: JUNE 17,1996 <br /> TO CONTRACTOR: 1 ARCHITECT'S PROJECT NO: 9214 <br /> (name, address) <br /> CONTRACT DATE: OCTOBER,1995 <br /> GRAUSCONSTRUCMNCOMPANY <br /> P.O.BOX 34 CONTRACT FOR: GENERALS INCLUDING <br /> HASTINGS,MN 55033 MECHANICAL AND ELECTRICAL <br /> The Contract is changed as follows: <br /> 1.WIDEN DOOR(91 STORAGE ROOM 108 ADD $636 <br /> 2 CREDIT FOR BURNISHED BLOCK CHANGE OF COLOR. SUBTRACT ($ 603) <br /> 3.ADDITIONAL FINISH HARDWARE ADD $995 <br /> NEfCHANGE $1028 NET <br /> • Not valid until signed by the Owner, Architect and Contractor. <br /> The origing Contract Sum (Guaranteed Maximum Price)was . . . . . . . . . . . . . . . . . . . . . . . .$ 3,151,900.00 <br /> Net change by previously authorized Change Orders . . . . . . . . . . . . . . .; . . . . . . . . . . . . . . .$ aesz.00 <br /> The ontract SUN)(Guaranteed Maximum Price)prior to this Change Order was. . . . . . . . . .$ 3.156,762.00 <br /> The 1=t Su (Guaranteed Maximum Price)will increase (decreased) <br /> (unchanged)by this Change Order in the amount of. . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 1028.00 <br /> The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order will be . .$ 3,157,790.00 <br /> The Contract Time will be(increased)(decreased uncllarlge by ( )days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is DECEMBER,1996 ' <br /> NOTE: This summary does not reflect changes in the Contract SUIll,Contract Time or Guaranteed Maxinlunl Price whicti have been authorized by <br /> Construction Change Directive. <br /> THE CITY OF ST.ANTHONYVILLAGE <br /> WILLIAMSO'BRIEN ASSOC GRAUS CONSTRUCTION <br /> ARCHITECT CONTRACTOR OWNER <br /> 1111 THIRD AVE.S.,SURE 156 P.O.BOX 34 3301 SILVER LAKE RD. <br /> Address Address Address <br /> MINNEAPOLIS,MN 55404 HASTINGS,MN 55.033 ST.ANTHONY,MN 55418 <br /> 13Y 13Y 13Y <br /> DA'Z'E DATE DATE <br /> M I I CAUTION: You should sign an original AIA document which has this caution printed in red. <br /> • An original assures that changes will not be obscured as may occur when documents are reproduced. <br /> AIA DOCUMENT G701 • CHANGE ORDER • I9H7 EDITION • AIA® • ©1987 • THE <br /> AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 G701-1987 <br /> WARNING:Unlicensed photocopying violates U.S.copyright laws and Is subject to legal prosecution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.