My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 06251996
StAnthony
>
City Council
>
City Council Packets
>
1996
>
CC PACKET 06251996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:29:34 PM
Creation date
12/30/2015 6:29:15 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 06251996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE OWNER ❑ <br /> ORDER <br /> ARCHITECT <br /> ONTRACTOR ❑ <br /> AIA DOCUMENT G701 FIELD ❑ <br /> OTHER ❑ • <br /> • PROJECT: ST.ANTHONY CITY HALL&COMMUNITY CTFL CHANGE ORDER NUMBER: 5 <br /> (name, address) SILVER LAKE RD.AT 33RD <br /> ST.ANTHONY,MN DATE: JUNE 18, 1996 <br /> TO CONTRACTOR: ARCHITECT'S PROJECT NO: 9214 <br /> (name, address) <br /> CONTRACT DATE: OCTOBER,1995 <br /> GRADS CONSTRUCTION COMPANY <br /> P.O.BOX 34 CONTRACT-FOR: GENERAL CONSTRUCTION.INCwDNG <br /> HASTINGS.WN 55033 MECHANICAL AND ELECTRICAL <br /> The Contract is changed as follows: <br /> 1.PROVIDE d INSTALL ADDITIONAL CASEWORK PER THE ATTACHED P.R.p6. ADD $18,184 <br /> NET CHANGE <br /> $18,184 NET <br /> • Not valid until signed by the Owner, Architect and Contractor. <br /> The original Contract Su (Guaranteed Maximum Price)was . . ... . . . . . . . . . . . . . . . . . . . .8 3,151,900.00 <br /> Net change by previously authorized Change Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 5890.00 <br /> The ontract Sum Guaranteed Maximum Price)prior to this Change Order was. . . . . . . . . .8 3,157, 90.00 <br /> The Contract Sum (Guaranteed Maximum Price)will be Increased (decreased) <br /> (unchanged)by this Change Order in the amount of. . . . . . . . . . . . . . . . . . . . . . . . . . . .8 18,184.00 <br /> The new ontract Sum (Guaranteed Maximum Price)including this Change Order will be . .8 3,175.974.00 <br /> The Contract Time will be(increased)(decreased) unchange by ( )days. <br /> The date of Substantial Completion as of the date of this range Order therefore is DECEMBER,1996 <br /> NOTE: This summary does not reflect changes in the Contrtcf Sum,'Contr.Ict Timc or Guaranteed Mazimturl Price which have been authorircd by <br /> Construction Ch:tnge Directive. <br /> THE CITY OF ST.ANTHONY VILLAGE <br /> WILLIAMSOBRIEN ASSOC GRADS CONSTRUCTION <br /> ARCI I II'ECT CONTRACTOR OWNER <br /> 1111 THIRD AVE.S.,SUITE 156 P.O.BOX 34 3301 SILVER LAKE RD. <br /> Address Address Address <br /> MINNEAPOLIS,MN 55404 HASTINGS,MN 55033 ST.ANTHONY,MN 55418 <br /> By By BY <br /> DATE DATE DATE. <br /> I , CAUTION: You should sign an original AIA document which has this caution printed in red. <br /> • An original assures that changes will not be obscured as may occur when documents are reproduced. <br /> AIA DOCUMENT G701 • CHANGE ORDER • 19H7 EI)TION • AIA • ©I')H7 • 'fill: <br /> AMERICAN INSTITUTE UI: ARCIII'IEC'I'S. I735 NEW YORK AVE.. N.Vd., VOASIIING'I"0N, D.C. 1(HHHI G701-1987 <br /> WARNING:Unlicensed photocopying violates U.S.copyright laws and Is subject to legal prosecution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.