My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 06231998
StAnthony
>
City Council
>
City Council Packets
>
1998
>
CC PACKET 06231998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:39:24 PM
Creation date
12/30/2015 6:39:03 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 06231998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 18, 1998 <br /> • Honorable Mayor and City Council <br /> City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55417 <br /> Re: Rehabilitation and Recoating of Existing Elevated Water Storage Tank <br /> Recommendation to Award Project <br /> RCM Project No. 10456.02 <br /> Dear Mayor and Council Members: <br /> Bids were received on June 18, 1998 and reviewed by RCM for the subject project. A <br /> total of five bids were received. The engineer's estimate for the project presented at the <br /> Council Meeting was as follows: <br /> • Tank Rehabilitation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $23,700 <br /> • Interior and Exterior Painting . . . . . . . . . . . . . . . . . . . . . . . . . . $125,000 <br /> • Construction Cost . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $148,700 <br /> Ic III • A/E Plans and Specifications $15,000 <br /> Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $163,700 <br /> • Construction Administration and Testing . . . . . . . . . . . . . . . . . . $19,000 <br /> rieke Project Cost . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $180,700 <br /> carroll <br /> muller <br /> ates, inc. V.E.Gray and Son Contracting,Inc.submitted the lowest bid of$166,642.00. A/E cost <br /> Witacects eers <br /> of plans and specifications will be $7,500 and the construction and testing should not <br /> land surveyors exceed$13,000. The total project cost is anticipated to be: <br /> equal opportunity Construction Cost . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $166,642 <br /> employer <br /> • A/E Plans and Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7,500 <br /> • Construction Administration and Testing . . . . . . . . . . . . . . . . . . . $13,000 <br /> • Construction Contingencies for Crack Filler and Welding . . . . . $7,000 <br /> y; Anticipated Total Project Cost . . . . . . . . . . . . . . . $194,142 <br /> Enclosed is a bid tabulation of the five bids submitted. We recommend award for the <br /> rehabilitation and recoating of the existing elevated storage tank to V.E. Gray and Son <br /> Contracting, Inc, the contractor submitting the lowest bid for a bid amount of <br /> $166,642.00 <br /> years <br /> of helping <br /> Sincerely, <br /> build <br /> communities <br /> Project Manager <br /> RIEKE CARROLL MULLER ASSOCIATES, INC. <br /> 10901 red circle dr. RCP/aec <br /> foffice box 130 <br /> etonka, mn <br /> 34 3-0130 cc: Jay Hartman, City of St. Anthony <br /> (612)935-6901 Mike Morrison, City of St. Anthony <br /> fax(612)935-8814 <br /> www.rcm-assoc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.