Laserfiche WebLink
Vou tail Lista <br /> wsB Project: Silver Point Park a Central Park Stormwater Improvement Project W. N mushal) <br /> Project Locaalan: City of St.Anthony Dale: 0511a19sf s <br /> D <br /> TNS9plrojectMe: 1065.30 _ -_ voucherxa a _ j <br /> 50 2503.541 72'RC PIPE DESIGN 3008 CLASS Il LF $17883 338.00 $59,414.88 0.00 $0.00 328.00. $58 00024 r <br /> _ t0 <br /> 51 2501.515 15'CONCRETE APRON WRH TRASH GUARD EACH $477.12 1.00 $477.12 0.00 i $0.00 1.00 - $477.12 1 <br /> 52 2501,515 1S"CONCRETE APRON WRHTRASH GUARD&SHEET PILING EACH SZ5034S 1.00 82.693.48 0.00 $0.00 1.00 $2,503.48 Q <br /> 53 2501.515 38'CONCRETE APRON WOHTRASH GUARD S SHEET PILING EACH 84.168.14 1.00 84,158.14 0.00 $0.00 1.00 $4,158.14 <br /> 54 2501.515 42CONCREMAPRON WITH TRASH GUARD&SHEET PILING EACH $4,597.66 1.00 $4,597.65 0.01) $0.00 1.00 $4,697.85 m <br /> 65 2501.619 FLAP GATE FOR 18'RC PIPE EACH 84.000.00 1.00 $4,000JDO 0.00 $0:00 0.00 $0.00 W <br /> 56 2502641 Ir DRAIN TILE WITH FILTER FABRIC&AGGREGATE LF $16.00 1210.00 $18,150.00 270.00 $4,050:90 1.370.00 $21),580.0 r <br /> 57 2508.501 CONSTRUCT DRAINAGE STRUCTURE DES.40402D LF $102-92 25.10 $2,68328 0.01) $QOO 19.30 $1.98888 <br /> 58 2508,601 CONSTRUCT DRAINAGE STRUCTURE DES,804020 LF $14529 22.00 $3,198.38 0.00 $000 7.30 $1,06D02 <br /> 59 2308601 CONSTRUCT DRAINAGE STRUCTURE DES.72.4020 LF $187.28 20.50 34,043.83 0.01) 80 O 19.80 $3.905675 <br /> 80 2505.501 CONSTRUCT DRAINAGE STRUCTURE DES.904020 IF $347.38 16.70 $5,800.91 0.00 8800 16.40 65,896.70 <br /> 81 2508501 CONSTRUCTDRAINA GE STRUCTURE DES.W4020 LF $423.00 1280 $5,329.80 0.00 SR00 0.00 $0,00 In <br /> m <br /> 82 2508.501 CONSTRUCT DRAINAGE STRUCTURE DES.1024020 LF 3635. 11.60 $7,377.69 0.00 80.00 15.73 $10,00,4.28 00 <br /> 63 2508.601 CONSTRUCTDRAINAGE STRUCTURE DES.=4020 LF $888.3 13.60 $12,081.63 0.00 30 00 38.50 032425.61 ID <br /> 64 2,508.502 CONSTRUCT DRAINAGE STRUCTURE DES.SPECIAL((X 39 Wi�CASTING EACH $885.24 1.00 569524 1.00 $89924 1.00 $89524 6i <br /> 45 2308.602 CONSTRUCT DRAINAGE STRUCTURE DES.SPECIAL(2'X 31 EACH $54524 1.00 $545,24 0.00 80.00 0.00 $0.00 0 <br /> 46 2508802 INSTALL SALVAGED CASTING(C.B.) EACH $204. 1.00 $204.00 0.00 80.00 0.90 $0. A <br /> 67 25MAD2 CONNECT TO OUSTING SGTORMSEWER EACH $642.5 700 84;497,50 0.00 $0.00 7.00 $4,497.50 N <br /> as 2508.615 CASTINOASSEMBLY EACH $385.1 9!00 35,460.59 9.00 $3486.63 000 $3,488.53 <br /> 49 2511.602 RANDOM RIP RAP CL IV CY $37.6 26.00 :97540 MOO $973.00 2900 $97500 (2--I <br /> 70 2571.641 TRANSPLANT TREES(,2•-47 TREE $155. 400 881200 000 80.01) 4.00 161200 <br /> 71 2573.91)2 SILT FENCE.TYPE HEAVY DUTY LF 42 200.00 340800 0.00 $0.00 0.00 $0.00 <br /> 72 0573,605 GEOTE)MLE FABRIC TYPE N SY $310 52.00 $181.20 52-OD $161.20 52.00 $161.20 <br /> 73 0503.602 18`RC 400 SEND(41 EACH $40800 too $408. 0.00 $0.00 2.00 $81200 <br /> 74 OSMA02 38'X 30'REDUCER EACH $614.58 1.00 8674 000 $0.00 1.00 $614.$0 <br /> 75 0504602 30'X 2T REDUCER EACH $442-22 1.00 $44 0.00 $0.00 100 344222 <br /> 70 , 2104.521. SALVAGE CHAIN LINK FENCE LF 45.10 .-..161),00 $745 000 $0.00 ._ 150,01) 3785.00 <br /> 77 0597.403. REINSTALL CHAIN LINK FENCE LF 37.65 160.00 $1.147. 0.00 $0.00 000 MOO <br /> TOTAL STORM SEWER IMPROVEMENTS-BASE 810 $41688011 $13,242.9 $418,&21.72 <br /> f.. <br /> ftl <br /> N <br /> A <br /> r <br /> m <br /> m <br /> "0 <br /> �i <br /> r <br /> Pgp3Me <br />