My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 05251999
StAnthony
>
City Council
>
City Council Packets
>
1999
>
CC PACKET 05251999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:08:24 PM
Creation date
12/30/2015 4:08:02 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 05251999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br /> DATE: May 19, 1999 <br /> TO: Michael J. Mornson, City Manager <br /> FROM: Kim Moore-Sykes, Management Assistant <br /> ITEM: May 18' Planning Commission Meeting Summary <br /> 1. Randy Stille will be the Planning Commission Representative to the May 25°i Council <br /> meeting. <br /> 2. Public Hearines. <br /> a. 99-02 Sunset Memorial Cemetery, Sideyard Variance Request. Motion made by <br /> Horst, seconded by Bergstrom to approve the applicant's variance request. Motion passed_ <br /> unanimously. <br /> b. 99-03 Dave Sperry, 4XXX Fordham Drive, Lot Width and Lot Area Variance <br /> Requests. Bob Graham, 4020 Fordham Drive spoke against the variance request because <br /> he stated concerns about flooding issues that are problematic in the area and which the <br /> City has not addressed. Chair Bergstrom reported that the City plans to redevelop <br /> Emerald Park, which will include a storm water retention basin. Keith Gordon, 4012 <br /> Fordham Drive spoke in favor of the variance. Mr. Gordon is a civil engineer for the City <br /> • of Apple Valley and he reported that the problem appears to be that the storm water pipe <br /> that carries water away from the area is too small to handle the run-off. He calculated that <br /> the proposed development of the vacant lot would increase the run-off by about 2%. Mr. <br /> Sperry noted too that Staff told him that the proposed structures could not exceed 35% of <br /> the lot and that the Planning Commission and City Council would probably not support <br /> other variance requests for the structures. Motion made by Horst, seconded by Bergstrom <br /> to approve the variance requests. The motion passed unanimously. <br /> C. 99-05 Coppo Partners, 2837 Anthony Lane South, Rear Yard Setback Variance <br /> Request. Motion made by Bergstrom, seconded by Horst to approve the applicant's <br /> variance request. The motion was based on the hardship created by the codification of the <br /> Zoning Code after the construction of the building and that bringing the addition forward <br /> would create structural problems and make maneuvering semi trucks into the proposed <br /> truck bays very difficult. Chair Bergstrom noted that because of a neighboring property <br /> situated in Roseville sits on a bank that makes it higher than the Coppo Partners building, <br /> there appears to be storm water run-off problems and suggested that some sort of draining <br /> mechanism or structure be installed. Bergstrom asked that the engineer on the project <br /> meet with Staff to determine what structure would be acceptable. The motion passed <br /> unanimously.. <br /> 3. Concept Review. None. <br /> 4. Report from the Parks Commission. None. <br />
The URL can be used to link to this page
Your browser does not support the video tag.