My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 12161999
StAnthony
>
City Council
>
City Council Packets
>
1999
>
CC PACKET 12161999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:11:03 PM
Creation date
12/30/2015 4:10:43 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 12161999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Meeting Minutes <br /> November 30, 1999 <br /> Page 6 <br /> 1 Cavanaugh added that the Heart of the Earth School is moving quickly and is looking ahead. It <br /> 2 has been suggested to hold a joint meeting between the City and the School Board, possibly in <br /> 3 January 2000. Cavanaugh stated as well that the County of Ramsey would not come into the <br /> 4 community without a letter from the City, but that the issue of funding is a top priority. <br /> 5 Cavanaugh felt that the meeting with Heart of the Earth School was productive and successful. <br /> 6 VIII. PUBLIC HEARINGS. <br /> 7 None. <br /> 8 IX. NEW BUSINESS. <br /> 9 A. Resolution 99-068 re: Receive Report and Order Specifications for Street and Sidewalk <br /> 10 Improvements on 33rd Avenue NE (SEH/RCM). <br /> 11 Mornson began by stating that in September 1999, the City Council ordered a feasibility study <br /> 12 and held a neighborhood meeting in October. Positive feedback was received from the residents <br /> 13 and Mornson stated that representatives from SEH/RCM are in.attendance to present the plan for <br /> 14 the reconstruction. <br /> 15 <br /> 16 Ranallo introduced Richard C. Potz, Project Manager, and Bob Moberg and invited them to ad- <br /> 17 dress the Council. <br /> 18 Mr. Potz reviewed for the Council that the firm of SEH/RCM was asked to prepare a Feasibility <br /> 19 Report for the improvements regarding 33rd Avenue from Silver Lake Road to Stinson Boule- <br /> 20 vard. Mr. Potz presented the Report to the Council and.reviewed the specific improvements to <br /> 21 be made. Those improvements would include (1) construction of a five-foot wide sidewalk and <br /> 22 modular block replacing walls on the north side of 33rd Avenue; (2) sanitary sewer <br /> 23 improvements to alleviate past sanitary sewer backups into residential basements on 33rd <br /> 24 Avenue between Edward Avenue and Belden Drive; and (3) storm sewer improvements on 33rd <br /> 25 Avenue near Edward Street. The total estimated project cost is $690,800. <br /> 26 Mr. Potz stated that on October 28, 1999, a neighborhood meeting was held and there were many <br /> 27 residents in attendance. Mr. Potz stated that the project was explained and, in particular, where <br /> 28 the sidewalk would be placed. It was also noted that stamped, colored crosswalk would be <br /> 29 placed at the east end. The residents were appreciative that there would not be any assessments <br /> 30 due to the project. Mr. Potz stated that SEH/RCM would be able to proceed as soon as the <br /> 31 Council approves the resolution authorizing the Feasibility Report. <br /> 32 Faust expressed concern that the number of catch basins was increasing from four to eight. He <br /> 33 inquired about the benefit of the additional basins if the pipe remains the same underneath. Mr. <br /> 34 Potz responded that there was a larger pipe south. <br />
The URL can be used to link to this page
Your browser does not support the video tag.