My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 04112000
StAnthony
>
City Council
>
City Council Packets
>
2000
>
CC PACKET 04112000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:13:02 PM
Creation date
12/30/2015 4:12:44 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 04112000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B.A.krtelstea! 40 <br /> 350 Westwood Lake Office Bret A.We'.-,, <br /> 8441 Wayzata Boulevard Peter R.Willenbring,P.E. <br /> Minneapolis, MN 55426 Donald W.Sterna,EE: <br /> • Ronald B.Bray P.E. <br /> 612-541-4800 <br /> &Associates, Inc. FAX 541-1700 <br /> February 29, 2000 <br /> Honorable Mayor, City Council, and City Staff <br /> City of St Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony,MN 55418-1699 <br /> Re: Sidewalk, Lighting, and Plantings for 29''Avenue- <br /> WSB Project No. 1065.26 <br /> Dear Honorable Mayor, City Council, and City Staff: <br /> As requested,we have prepared for your review a concept plan showing sidewalk along the north <br /> side of 29' Avenue, along with decorative lighting and additional plantings. A typical section and <br /> plan view showing the locations of decorative lighting,plantings, and the sidewalk along 291h <br /> • Avenue are enclosed. <br /> The anticipated costs for constructing these additional improvements to 29`'Avenue are as follows: <br /> Item Qty Unit Unit Price Estimated <br /> Cost <br /> 1. Sidewalk(Stinson Blvd to Silver Lake Rd) 11,000 cf $3.00 $33,000.00 <br /> 2. Sidewalk(Crestview to County Rd 88) 6,100 cf $3.00 $18,300.00 <br /> 3. Decorative lighting 36 fixtures $4,000.00 $144,000.00 <br /> 4. Plantings 44 trees $350.00 $15,400.00 <br /> Total Cost $210,700.00 <br /> The-costs shown above include the installation of electrical conduit wiring and control structures for <br /> the installation of decorative lighting from Stinson Boulevard to County Road 88. Both the <br /> decorative lighting costs and the costs for additional trees along the 291 Avenue corridor vary greatly <br /> upon which type of fixtures or which type of tree species are chosen for installation. In addition, for <br /> lighting there is usually an annual maintenance agreement which can be entered into which would <br /> cover the ongoing maintenance costs associated with the installation of decorative lighting. This <br /> . cost will be in addition to the numbers outlined above. <br /> F-%WPW1MI065.2nn900-hn -WP2 <br /> Min n e a p o l i s S t . C l o u d <br /> Infrastructure Engineers Planners <br /> ,..,T T.T t'%nnP1n'M TATTTV CAAT)T nVCD <br />
The URL can be used to link to this page
Your browser does not support the video tag.