Laserfiche WebLink
to 7 <br /> UM <br /> ® BRW, Inc. <br /> Jay Hartman <br /> January 17, 2001 <br /> Page 4 <br /> For cost estimating purposes,.we assume that one fill sample from each boring will be analyzed for the above- <br /> indicated parameters. <br /> Temporary monitoring wells will be installed in each boring. One ground water sample will be collected from <br /> each temporary monitoring well. The samples will be analyzed for the following parameters: <br /> • VOCs-MDH Method 466A; <br /> • DRO-Modified WDNR DRO Method; and <br /> • GRO -Modified WDNR GRO Method. <br /> For cost estimating purposes, we assume that one ground water.sample from each temporary monitoring well will <br /> be analyzed for the above-indicated parameters. The temporary wells will be removed following ground water <br /> sample collection. <br /> Methane Monitoring <br /> Up to five temporary gas-monitoring probes will be advanced at the property to determine the extent which <br /> methane is being generated, if any. The exact locations of the probes will be based on the results of the <br /> geophysical, .test trench and soil boring investigations. Gas samples, will be collected from each probe for, <br /> methane screening with a combustible gas meter. <br /> Gas samples will also be collected from the storm sewer manholes across the property for methane screening with <br /> a combustible gas meter. <br /> Task 5: Phase II Investigation Report <br /> Results of the investigation will be compiled into a Phase II Investigation Report. The report will be prepared in <br /> accordance with VIC Program guidance,and will include the following: <br /> • Background information, including Phase I ESA and geotechnical investigation results; <br /> • Drawings depicting site location, site diagram, investigation activities,extent of dump materials, and extent of <br /> groundwater impacts; <br /> • Graphical portrayal of the geophysical investigation results; <br /> • Soil boring,temporary monitoring well and test trench logs; <br /> • Tabulated field screening and analytical testing results; <br /> • Detailed analysis and summary of the investigation results; and <br /> • Conclusions and recommendations regarding the extent and magnitude of impacts at the site, and the need for <br /> corrective actions in conjunction with park redevelopment. <br /> Task 6 -Response Action Plan <br /> BRW will prepare a Response Action Plan (RAP) to address environmental issues related to park redevelopment. <br /> The RAP will include details regarding the following: <br /> • • worker health and safety; <br /> • emission controls during excavation; <br /> • characterization and disposition of excavated materials; <br />