My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 03122002
StAnthony
>
City Council
>
City Council Packets
>
2002
>
CC PACKET 03122002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:55:59 PM
Creation date
12/30/2015 7:55:42 PM
Metadata
Fields
SP Box #
29
SP Folder Name
CC PACKETS 2001-2004
SP Name
CC PACKET 03122002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
67 <br /> The following is a summary of the approval process for the Central Park design and cost estimate: <br /> 1. June 4, 2001: SEH submitted a design and cost estimate of$295,884 to the Parks Commission. <br /> This design was presented and rejected because it was too small. <br /> 2. June 19, 2001: A meeting was held with Jay Hartman, Bob Kost of URS, Carol Jindra, Maurie <br /> Anderson, and Molly Olivier to discuss the total budget as submitted in a memo by URS. Carol <br /> recommended the City subtract $153,000 (identified for irrigation and past professional fees) <br /> from the list and make this amount available for the Central Park building project. It was <br /> decided that Molly should proceed with the design of the building at the cost of $419,088. <br /> (Subsequent to this meeting, SEH developed another cost estimate confirming the design at <br /> $418,092). <br /> 3. July 9, 2001: This information was presented to the Parks Commission based on their previous <br /> directive in Item 2 above. SEH was directed to present this same information to the City <br /> Council. <br /> 4. August 13, 2001: Molly Olivier of SEH confirmed and reviewed the upcoming presentation <br /> with the Parks Commission. <br /> 5. August 14, 2001: Molly Olivier presented this design and the estimate of $418,092 to the City <br /> Council. (It should be noted that the soils condition of Central Park was not available until much <br /> later. That soils report later revealed that an additional $20,000 was necessary for soils <br /> correction). This design and cost estimate, as submitted by SEH, was approved and SEH was <br /> directed to proceed with construction documents and public bidding for the project. <br /> 6. February 19, 2002: The low bid received for the Central Park building is $453,096.90. As a <br /> point of reference, the total estimated cost, including soils correction, for the Central Park <br /> project was $438,092. <br /> \\sehsc3\scu\santh\0102\1-genl\14-corr\project review.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.