My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 05282003
StAnthony
>
City Council
>
City Council Packets
>
2003
>
CC PACKET 05282003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:01:27 PM
Creation date
12/30/2015 8:01:12 PM
Metadata
Fields
SP Box #
29
SP Folder Name
CC PACKETS 2001-2004
SP Name
CC PACKET 05282003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Honorable Mayor, City Council, and 70 <br /> City Staff <br /> May 21, 2003 <br /> Page 3 <br /> VI. Water Treatment Plant Improvements <br /> Alternatives for improving the chemical treatment process at the City's water <br /> treatment plant have been prepared and reviewed with City staff. A chemical <br /> treatment process has been selected and final plans and specifications for the <br /> treatment plant improvements are underway. It is anticipated that the project will <br /> be bid this fall with construction occurring over the winter months. <br /> VII. Kenzie Terrace Water Main and Sanitary Sewer Improvements <br /> Plans and specifications for the Kenzie Terrace water main and sanitary sewer <br /> improvements are complete. Discussions are still being held with the Metropolitan <br /> Council on their concerns associated with the Met Council Meter Station located in <br /> the vicinity of Lowry and Harding Street in Minneapolis. We anticipate holding a <br /> meeting with the Metropolitan Council to discuss the issues associated with the <br /> proposed sanitary and sewer improvements in the first week of June. <br /> Following this meeting, we anticipate the plans would be revised to address the <br /> issues presented by the Metropolitan Council and that Advertisements for Bids <br /> would begin at the end of June with a bid opening in mid-July and construction <br /> beginning thereafter. <br /> A neighborhood meeting will be held in July to discuss the project schedule and a <br /> proposed scope of impacts to the residents and businesses adjacent to the proposed <br /> improvements. <br /> VIII. 2003 Street Reconstruction <br /> Phase I of the 2003 Street Reconstruction, which is Edward Street from 33rd <br /> Avenue to 34th Avenue and 34th Avenue from Stinson Boulevard to Edward Street, <br /> is nearing completion. All the utilities have been installed and the road <br /> reconstruction work is progressing according to schedule. The Contractor has <br /> requested that the construction schedule be modified. The new schedule anticipates <br /> completion of this year's project by the end of August reducing the construction <br /> period by nearly two months. Furthermore, the Contractor has provided assurances <br /> to the City that if the project does not proceed in accordance with our expectations, <br /> that the Contractor would cease operations and return to the original construction <br /> schedule. <br /> It is our anticipation that by moving the construction schedule up two months we <br /> can reduce the duration and inconveniences of construction activities to the <br /> residents within the project limits. <br /> F:I WPW1M1065-011052103-hmcc.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.