WSB = B I OC N�.
<br /> a euocla a.!nc
<br /> Phase I,39th Avenue Reconstruction,Storm Sewer
<br /> Project Name:Watermain,Sanitary Sewer&Appurtenant Work Project No.:01065-85
<br /> Client: St Anthony Village 1 hereby certify that this is an exact reproduction of bids received.
<br /> Bid Opening:April 20,2004 at 10:00 am Engineer: Todd E.Humber,P.E., Project Manager
<br /> ,'"""- 'DENOTES CORRECTED FIGURE Engineers Bidder No.1 Bidder No.2 Bidder No.3
<br /> Opinion of Cost Veit&Company,Inc. Northdale Construction Barbarossa&Sons,Inc.
<br /> Item
<br /> Num I Mat.No. Units Qty Unit Price Total Unit Price Total Unit Price Total Unit Price Total
<br /> SCHEDULE A-SURFACE IMPROVEMENTS
<br /> 1 2021.501 MOBILIZATION(5%) LUMP SUM 1 $30,000.00 $30,000.00 $16,864.09 $16,864.09 $16,500.00 $16,500.00 $25,800.00 $25,800.00
<br /> 2 2104.501 REMOVE CURB AND GUTTER LIN FT 975 $5.00 $4,875.00 $4.60 $4,485.00 $2.75 $2,681.25 $4.00 $3,900.00
<br /> 3 2104.503 REMOVE CONCRETE SIDEWALK SO FT 1000 $1.50 $1,500.00 $0.60 $600.00 $0.65 $650.00 $1.00 $1,000.00
<br /> 4 2104.503 REMOVE CONCRETE PAVEMENT SO FT 12690 $3.00 $38,070.00 $0.50 $6,345.00 $1.17 $14,847.30 $0.85 $10,786.50
<br /> 5 2104.505 REMOVE BITUMINOUS PAVEMENT SQ YD 2370 $2.25 $5,332.50 $0.70 $1,659.00 $2.75 $6,517.50 $3.00 $7,110.00
<br /> 6 2104.503 REMOVE CONCRETE MEDIAN SQ FT 400 $2.00 $800.00 $0.40 $160.00 $1.00 $400.00 $2.00 $800.00
<br /> 7 2104.513 SAWING BITUMINOUS PAVEMENT(FULL DEPTH) LIN FT 90 $4.50 $405.00 $1.60 $144.00 $4.50 $405.00 $3.00 $270.00
<br /> 8 2104.511 SAWING CONCRETE PAVEMENT(FULL DEPTH) LIN FT 140 $4.50 $630.00 $3.00 $420.00 $7.50 $1,050.00 $4.00 $560.00
<br /> 9 2105.507 SU13GRADE EXCAVATION CU YD 250 $6.00 $1,500.00 $1.50 $375.00 $3.50 $875.00 $7.00 $1,750.00
<br /> 10 2105.522 SELECT GRANULAR BORROW(CV)(P) CU YD 170 $13.00 $2,210.00 $12.00 $2,040.00 $18.75 $3,187.50 $17.00 $2,890.00
<br /> 11 2105.604 GEOTEXTILE FABRIC TYPE V SO YD 500 $1.75 $875.00 $0.45 $225.00 $1.15 $575.00 $2.15 $1,075.00
<br /> 12 2211.501 AGGREGATE BASE CLASS 5(100%CRUSHED) TON 575 $15.00 $8,625.00 $17.00 $9,775.00 $18.50 $10,637.50 $13.00 $7,475.00
<br /> 13 2340.508 TYPE 41 WEARING COURSE MIXTURE TON 95 $36.00 $3,420.00 $63.00 $5,985.00 $66.00 $6,270.00 $60.00 $5,700.00
<br /> 14 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON 25 $2.50 $62.50 $5.00 $125.00 $5.50 $137.50 $5.00 $125.00
<br /> 15 2531.501 CONCRETE CURB&GUTTER DESIGN B618 LIN FT 170 $15.00 $2,550.00 $15.75 $2,677.50 $23.50 $3,995.00 $15.00 $2,550.00
<br /> 16 2563.601 TRAFFIC CONTROL LUMP SUM 1 $6,000.00 $6,000.00 $1,400.00 $1,400.00 $2,000.00 $2,000.00 $1,300.00 $1,300.00
<br /> 17 2573.502 SILT FENCE,TYPE HEAVY DUTY(ORANGE) LIN FT 100 $4.50 $450.00 $1.50 $150.00 $3.50 $350.00 $5.00 $500.00
<br /> 18 2575.505 SODDING,TYPE LAWN(INCL.TOPSOIL&FERT.) SO YD 95 $4.00 $380.00 $6.00 $570.00 $6.50 $617.50 $10.00 $950.00
<br /> 19 2573.602 INLET PROTECTION EACH 3 $75.00 $225.00 $110.00 $330.00 $125.00 $375.00 $450.00 $1,350.00
<br /> 20 2565.602 PVC LOOP DETECTOR 6X15' EACH 1 2 $125.00 $250.00 $756.00 $1,512.00 $1,925.00 $3,850.00 $1,300.00 $2,600.00
<br /> 21 2565.602 PVC LOOP DETECTOR 6'X6' EACH 2 $100.00 $200.00 $630.00 $1,260.00 $1,375.00 $2,750.00 $1,000.00 $2,000.00
<br /> TOTAL SCHEDULE A-SURFACE IMPROVEMENTS $108,360.00 1 $57,101.59 $78,671.05 $80,491.50
<br /> SCHEDULE B-SANITARY SEWER IMPROVEMENTS
<br /> 22 2104.603 ABANDON PIPE SEWER LIN FT 490 $6.00 $2,940.00 $1.50 $735.00 $3.50 $1,715.00 $8.00 $3,920.00
<br /> 23 2104.525 ABANDON MANHOLE EACH 3 $300.00 $900.00 $380.00 $1,140.00 $550.00 $1,650.00 $500.007 $1,500.00
<br /> 24 2104.509 REMOVE MANHOLE(SANITARY) EACH 2 $250.00 $500.00 $425.00 $850.00 $750.00 $1,500.00 $400.00 $800.00
<br /> Page 1 of 8 F.IWPWIM1065-851,Exce111 0 6 5-8 5 Bid TabulationBid Tab