A
<br /> WSB
<br /> n- Phase I,39th Avenue Reconstruction,Storm Sewer
<br /> Project Name:Waterrnain,Sanitary Sewer&Appurtenant Work Project No.:01065-85
<br /> Client: St Anthony Village I hereby certify that this is an exact reproduction of bids received.
<br /> Bid Opening:April 20,2004 at 10:00 am Engineer. Todd E.Humber, P.E., Project Manager
<br /> FK-;4:N DENOTES CORRECTED FIGURE Engineer's Bidder No.1 Bidder No.2 Bidder No.3
<br /> Opinion of Cost Veit&Company,Inc. Northdale Construction Barbarossa&Sons,Inc.
<br /> Item
<br /> Num Mal No. Units City Unit Price Total Unit Price Total Unit Price Total Unit Price Total
<br /> 50 2504.602 HYDRANT EACH 3 $2,000.00 $6,000.00 $2,100.00 $6,300.00 $1,788.79 $5,366.37 $2,200.00 $6,600.00
<br /> 51 2504.602 6"GATE VALVE AND BOX EACH 5 $650.00 $3,250.00 $756.00 $3,780.00 $535.54 $2,677.70 $600.00 $3,000.00
<br /> 52 2504.602 8"GATE VALVE AND BOX EACH 7 $800.00 $5,600.00 $944.00 $6,608.00 $707.27 $4,950.89 $800.00 $5.600.00
<br /> 53 2504.602 10"GATE VALVE AND BOX EACH 7 $1,100.00 $7,700.00 $1,231.00 $8,617.00 $1,035.67 $7,249.69 $1,000.00 $7,000.00
<br /> 54 2504.603 6"WATER MAIN,D.I.P.,CL 52 W/POLY WRAP LIN FT 125 $28.00 $3,500.00 $16.80 $2,100.00 $22.83 $2,853.75 $22.00 $2,750.00
<br /> 55 2504.603 8"WATER MAIN,D.I.P.,CL 52 W/POLY WRAP LIN FT 360 $31.00 $11,160.00 $21.60 $7,776.00 $28.01 $9,363.60 $26.00 $9,360.00
<br /> 56 2504.603 10"WATER MAIN,D.I.P.,CL 52 W/POLY WRAP LIN FT 1420 $34.00 $48,280.00 $26.00 $36,920.00 $25.08 $35,613.60 $29.00 $41,180.00
<br /> 57 2504.608 DUCTILE IRON FITTINGS POUND 6900 $2.50 $17,250.00 $1.00 $6,900.00 $1.83 $12,627.00 $1.75 $12,075.00
<br /> TOTAL SCHEDULE C-WATERMAIN IMPROVEMENTS 1 $126,997.50 $88,276.00 1 $89,433.80 $105,755.00
<br /> SCHEDULE D-STORM SEWER IMPROVEMENTS
<br /> 58 2105.604 GEOTEXTILE FABRIC TYPE IV SO YD 62 $3.00 $186.00 $1.50 $93.00 $2.50 $155.00 $3.00 $186.00
<br /> 59 2451.602 GRANULAR FOUNDATION AND/OR BEDDING TON 830 $20.00 $16,600.00 $1.00 $830.00 $0.01 $8.30 $10.00 $8,300.00
<br /> 60 2503.541 15"RC PIPE SEWER DESIGN 3006 CLASS V LIN FT 332 $30.00 $9,960.00 $21.00 $6.972.00 $28.29 $9,392.28 $28.00 $9,296.00
<br /> 61 2503.541 21"RC PIPE SEWER DESIGN 3006 CLASS III LIN FT 247 $34.00 $8,398.00 $27.00 $6.669.00 $31.24 $7,716.28 $32.00 $7,904.00
<br /> 62 2503.541 24"RC PIPE SEWER DESIGN 3006 CLASS III LIN FT 87 $36.00 $3,132.00 $28.00 $2,436.00 $33.35 $2,901.45 $36.00 $3,132.00
<br /> 63 2503.541 27"RC PIPE SEWER DESIGN 3006 CLASS III LIN FT 182 $44.00 $8,008.00 $36.50 $6,643.00 $40.44 $7,360.08 $43.00 $7,826.00
<br /> 64 2503.541 30"RC PIPE SEWER DESIGN 3006 CLASS III LIN FT 291 $46.00 $13,386.00 $43.00 $12,513.00 $45.07 $13,115.37 $48.00 $13,968.00
<br /> 65 2503.541 33"RC PIPE SEWER DESIGN 3006 CLASS III LIN FT 176 $52.00 $9,256.00 $54.00 $9,612.00 $51.94 $9,245.32 $55.00 $9,790.00
<br /> 66 2573.51 RISER STANDPIPE EACH 12 $150.00 $1,800.00 $353.00 $4,236.00 $175.00 $2,100.00 $96.00 $1,152.00
<br /> 67 2575.513 MULCH MATERIAL TYPE 9 CU YD 17 $18.00 $306.00 $33.00 $561.00 $23.50 $399.50 $25.00 $425.00
<br /> 68 2503.541 60"RC PIPE SEWER DESIGN 3006 CLASS III LIN FT 63 $140.00 $8,820.00 $130.00 $8,190.00 $165.55 $10,429.65 $136.00 $8,568.00
<br /> 69 2503.603 8"PVC PIPE SEWER,SDR 35 LIN FT 225 $21.00 $4,725.00 $10.60 $2,385.00 $19.85 $4,466.25 $20.00 $4,500.00
<br /> 70 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48- LIN FT 47.1 $275.00 $12,952.50 $221.00 $10,409.10 $153.00 $7,206.30 $250.00 $11,775.00
<br /> 4020
<br /> 71 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 54- LIN FT 30.58 $300.00 $9,174.00 $373.00 $11,406.34 $199.00 $6,085.42 $290.00 $8,868.20
<br /> 4020
<br /> 72 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 102- LIN FT 9.19 $600.00 $5,514.00 $897.00 $8,243.43 $888.00 $8,160.72 $750.00 $6,892.50
<br /> 4020
<br /> 73 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN H LIN FT 22.68 $225.00 $5,103.00 $250.00 $5,670.00 $233.00 $5,284.44 $230.00 $5,216.40
<br /> Page 3 of 8 F:IWPW1M1065-851ExceA1065-85 Bid TabulationBid Tab
<br />
|