Laserfiche WebLink
H SB B� Q D X41-L <br /> Phase I,39th Avenue Reconstruction,Storm Sewer <br /> Project Name:Watermain,Sanitary Sewer&Appurtenant Work Project No.:01065-85 <br /> Client: St Anthony Village I hereby certify that this is an exact reproduction of bids received. <br /> Bid Opening:April 20,2004 at 10:00 am Engineer: Todd E.Humber,P.E., Project Manager <br /> '' jA DENOTES CORRECTED FIGURE Engineers Bidder No.4 <br /> Opinion of Cost Three Rivers Const. <br /> Item <br /> Num I Mat.No. Units Qty Unit Price Total Unit Price Total <br /> SCHEDULE A-SURFACE IMPROVEMENTS <br /> 1 2021.501 MOBILIZATION(5%) LUMP SUM 1 $30,000.00 $30,000.00 $6,570.00 $6,570.00 <br /> 2 2104.501 REMOVE CURB AND GUTTER LIN FT 975 $5.00 $4,875.00 $5.00 $4,875.00 <br /> 3 2104.503 REMOVE CONCRETE SIDEWALK SO FT 1000 $1.50 $1,500.00 $0.25 $250.00 <br /> 4 2104.503 REMOVE CONCRETE PAVEMENT SO FT 12690 $3.00 $38,070.00 $0.25 $3,172.50 <br /> 5 2104.505 REMOVE BITUMINOUS PAVEMENT SO YD 2370 $2.25 $5,332.50 $2.29 $5,427.30 <br /> 6 2104.503 REMOVE CONCRETE MEDIAN SO FT 400 $2.00 $800.00 $0.25 $100.00 <br /> 7 2104.513 SAWING BITUMINOUS PAVEMENT(FULL DEPTH) LIN FT 90 $4.50 $405.00 $5.15 $463.50 <br /> 8 2104.511 SAWING CONCRETE PAVEMENT(FULL DEPTH) LIN FT 140 $4.50 $630.00 $5.15 $721.00 <br /> 9 2105.507 SUBGRADE EXCAVATION CU YD 250 $6.00 $1,500.00 $7.06 $1,765.00 <br /> 10 2105.522 SELECT GRANULAR BORROW(CV)(P) CU YD 170 $13.00 $2,210.00 $23.39 $3,976.30 <br /> 11 2105.604 GEOTEXTILE FABRIC TYPE V SO YD 500 $1.75 $875.00 $2.18 $1,090.00 <br /> 12 2211.501 AGGREGATE BASE CLASS 5(100%CRUSHED) TON 575 $15.00 $8,625.00 $14.31 $8,228.25 <br /> 13 2340.508 TYPE 41 WEARING COURSE MIXTURE TON 95 $36.00 $3,420.00 $61.80 $5,871.00 <br /> 14 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON 25 $2.50 $62.50 $5.15 $128.75 <br /> 15 2531.501 CONCRETE CURB 8 GUTTER DESIGN 8618 LIN FT 170 $15.00 $2,550.00 $20.60 $3,502.00 <br /> 16 2563.601 TRAFFIC CONTROL LUMP SUM 1 $6,000.00 $6,000.00 $1,545.00 $1,545.00 <br /> 17 2573.502 SILT FENCE,TYPE HEAVY DUTY(ORANGE) LIN FT 100 $4.50 $450.00 $5.15 $515.00 <br /> 18 2575.505 SODDING,TYPE LAWN(INCL.TOPSOIL 8 FERT.) SO YD 95 $4.00 $380.00 $10.00 $950.00 <br /> 19 2573.602 INLET PROTECTION EACH 3 $75.00 $225.00 $154.50 $463.50 <br /> 20 2565.602 PVC LOOP DETECTOR 6'X15' EACH 2 $125.00 $250.00 $1,493.50 $2,987.00 <br /> 21 2565.602 PVC LOOP DETECTOR 6'X6' EACH 2 $100.00 $200.00 $1,158.75 $2,317.50 <br /> TOTAL SCHEDULE A-SURFACE IMPROVEMENTS $108,360.00 $54,918.60 <br /> SCHEDULE B-SANITARY SEWER IMPROVEMENTS <br /> 22 2104.603 ABANDON PIPE SEWER LIN FT 490 $6.00 $2,940.00 $10.50 $5,145.00 <br /> 23 2104.525 ABANDON MANHOLE EACH 3 $300.00 $900.00 $300.00 $900.00 <br /> 24 2104.509 REMOVE MANHOLE(SANITARY) EACH 2 $250.00 $500.00 $300.00 $600.00 <br /> Page 5 of 8 F.'I WPMAA1085-851Exce/11065-85 Bid TabulationBid Tab <br />