A
<br /> WSB ® p
<br /> Phase I,39th Avenue Reconstruction,Storrs Sewer
<br /> Project Name:Watermain,Sanitary Sewer&Appurtenant Work Project No.:01065-85
<br /> Client: St Anthony Village I hereby certify that this is an exact reproduction of bids received.
<br /> Bid Opening:April 20,2004 at 10:00 am Engineer: Todd E. Humber, P.E., Project Manager
<br /> N J DENOTES CORRECTED FIGURE Engineers Bidder No.4
<br /> Opinion of Cost Three Rivers Const.
<br /> Item
<br /> Num Mat.No. Units Qty Unit Price Total Unit Price Total
<br /> 50 2504.602 HYDRANT EACH 3 $2,000.00 $6,000.00 $1,779.24 $5,337.72
<br /> 51 2504.602 6"GATE VALVE AND BOX EACH 5 $650.00 $3,250.00 $747.84 $3,739.20
<br /> 52 2504.602 8"GATE VALVE AND BOX EACH 7 $800.00 $5,600.00 $951.68 $6,661.76
<br /> 53 2504.602 10"GATE VALVE AND BOX EACH 7 $1,100.00 $7,700.00 $1,249.54 $8,746.78
<br /> 54 2504.603 6"WATER MAIN,D.I.P.,CL 52 W/POLY WRAP LIN FT 125 $28.00 $3,500.00 $31.57 $3,946.25
<br /> 55 2504.603 8"WATER MAIN,D.I.P.,CL 52 W/POLY WRAP LIN FT 360 $31.00 $11,160.00 $35.02 $12,607.20
<br /> 56 2504.603 10"WATER MAIN,D.I.P.,CL 52 W/POLY WRAP LIN FT 1420 $34.00 $48,280.00 $31.83 $45,198.60
<br /> 57 2504.608 DUCTILE IRON FITTINGS POUND 6900 $2.50 $17,250.00 $2.11 $14,559.00
<br /> ITOTAL SCHEDULE C-WATERMAIN IMPROVEMENTS $126,997.50 $113,089.56
<br /> SCHEDULE D-STORM SEWER IMPROVEMENTS
<br /> 58 2105.604 GEOTEXTILE FABRIC TYPE IV SQ YD 62 $3.00 $186.00 $3.74 $231.88
<br /> 59 2451.602 GRANULAR FOUNDATION AND/OR BEDDING TON 630 $20.00 $16,600.00 $4.00 $3,320.00
<br /> 60 2503.541 15'RC PIPE SEWER DESIGN 3006 CLASS V LIN FT 332 $30.00 $9,960.00 $28.14 $9,342.48
<br /> 61 2503.541 21"RC PIPE SEWER DESIGN 3006 CLASS III LIN FT 247 $34.00 $8,398.00 $32.22 $7,958.34
<br /> 62 2503.541 24"RC PIPE SEWER DESIGN 3006 CLASS III LIN FT 87 $36.00 $3,132.00 $34.17 $2.972.79
<br /> 63 2503.541 27"RC PIPE SEWER DESIGN 3006 CLASS III LIN FT 182 $44.00 $8,008.00 $41.50 $7,553.00
<br /> 64 2503.541 30"RC PIPE SEWER DESIGN 3006 CLASS III LIN FT 291 $46.00 $13,386.00 $44.62 $12,984.42
<br /> 65 2503.541 33"RC PIPE SEWER DESIGN 3006 CLASS III LIN FT 178 $52.00 $9,256.00 $51.41 $9,150.98
<br /> 66 2573.51 RISER STANDPIPE EACH 12 $150.00 $1,800.00 $150.00 $1,800.00
<br /> 67 2575.513 MULCH MATERIAL TYPE 9 CU YD 17 $18.00 $306.00 $29.64 $503.88
<br /> 68 2503.541 60"RC PIPE SEWER DESIGN 3006 CLASS III LIN FT 63 $140.00 $8,820.00 $129.42 $8,153.46
<br /> 69 2503.603 8"PVC PIPE SEWER.SDR 35 LIN FT 225' $21.00 $4,725.00 $16.78 $3,775.50
<br /> 70 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48- LIN FT 47.1 $275.00 $12,952.50 $245.69 $11,572.00
<br /> 4020
<br /> 71 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 54- LIN FT 30.58 $300.00 $9,174.00 $240.34 $7,349.60
<br /> 4020
<br /> 72 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 102 LIN FT 9.19 $600.00 $5,514.00 $741.67 $6,815.95
<br /> 4020
<br /> 73 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN H LIN FT 22.68 $225.00 $5,103.00 $290.30 $6,584.00
<br /> Page 7 of 8 F.IWPWIM1065-851Excel1f065-85 Bid TabulationBld Tab