My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION 07252000
StAnthony
>
City Council
>
City Council Work Session
>
2000
>
CC WORKSESSION 07252000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:15:49 PM
Creation date
12/30/2015 4:15:28 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC WORKSESSION 07252000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jay Hartman 10 <br /> July 12, 2000 �1 <br /> Page 2 <br /> J <br /> shelter, site furnishings, drinking fountain, decorative fencing, walkways, trails, lighting and <br /> landscaping. <br /> Prepare engineers'estimate of probable construction cost. <br /> Facilitate monthly design review meetings with City staff(4 estimated). <br /> Attend two Parks Commission meetings at the 75% and 95% stage to update the commission <br /> during the plan preparation and cost estimating process. <br /> Task II. Public Hearing and Bid Letting <br /> Attend public hearing to present project, answer questions, etc. <br /> Assist the public works director in the preparation of advertisement for bids. <br /> Attend bid opening, review and tabulate bids. <br /> Assist City engineer in bid award. <br /> Task III. Construction Administration and Inspection <br /> Assist City Engineer in award and administration of construction contract. <br /> Observe construction, review shop drawings, perform regular inspection of construction <br /> activities, prepare field reports, review testing reports, grade lines and layouts and report monthly <br /> progress to Parks Commission. <br /> Facilitate regular construction progress meetings with contractor and City engineer and review <br /> contractors application for payment and change orders. <br /> Prepare final punch list and review project completion. <br /> Inspect warranty work and monitor correction and completion activities. <br /> NOTE: Construction surveying and staking are not included in these services. This work would <br /> be provided by the general contractor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.