Laserfiche WebLink
50 Park Sin EA 3 $ .1,500.00 $ 4,500.00 <br /> 51' Batting Cage Foundation&Relocation EA 2 $ 3,000.00 $ 6,000.00 ' <br /> 52 Soccer Goal Posts EA 6 $ 1,000.00 $ 6,000.00 <br /> G.Micellaneous <br /> 53 Lighting for Multi-use Fields EA 10 $ 20,000.00 $ 200,000.00 ' <br /> 54 Pedestrian Lighting EA 2 $ 3,000.00 $ 6,000.00 ' <br /> 55 Pavillion w/Concession and Bathroom SF 400 $ 200.00 $ 80,000.00 <br /> 56 Irrigation for Varsity Baseball EA 1 $ 20,000.00 $ 20,000.00 ' <br /> 57 Irrigation for multi-use fields EA 3 $ 25,000.00 $ 75,000.00 ' <br /> 58 Bleachers EA 3 $ 5,000.00 $ 15,000.00 ' <br /> 59 Parkin Lot Resurfacing Mill and Overlay) SY 5000 $ 6.00. $ 30,000.00 ' <br /> 601 Parking Lot Stripping SY 5000 $ 1.20 $ 6,000.00 ' <br /> 61 Ornamental Fencing at N/E Park Entrance LF 80 $ 60.00 $ 4,800.00 <br /> Sub Total $ 1,502,860.00 <br /> Contingency(10%) $ 150,286.00 <br /> Grand Total $ 1,653,146.00 <br /> 30' Includes new pool foundation,mechanical,connection,electrical and all related pool construction. <br /> 44' Includes 3 ft.wide on both sides of trail,varsity baseball infield.and outfield only. <br /> 48' Batting Cages(12'xl5'x75')with chain link and netting inside cage for protection. <br /> 'Not(Project Elements added to project since 1999 Concept Plan <br />