My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 09191995
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
1995
>
PL PACKET 09191995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 5:30:43 PM
Creation date
12/30/2015 5:30:23 PM
Metadata
Fields
SP Box #
20
SP Folder Name
PL PACKETS 1995
SP Name
PL PACKET 09191995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 6 COMMUNITY FACILITIES 119 <br /> Reviewing the trunk sewer systems capacity as outlined above, indicates no trunk system <br /> capacity problems. In fact, much of the trunk system will be operating around 50% capacity <br /> which provides a good factor of safety. <br /> LATERAL SYSTEM CAPACITY <br /> The lateral system as it presently exists has no capacity problem. However, when future <br /> lateral extensions are made to serve major new developments. the adequacy of the lateral <br /> mains should be checked. In most cases, if one lateral branch does not have adequate <br /> capacity, other alternate branches are probably available not too far away. Sewer subdistricts <br /> where the situation would most likely occur would be Numbers 7, 11, 13, 18, 20, 21, 25, <br /> 26, 27, 28, 31, 33 and 38. <br /> LIFT STATIONS <br /> Lift Station No. 2 — Lift Station No. 2 is located in the alley north of County Road E2 <br /> between 2nd and 3rd Avenues Northwest. This station is a 200 gallon per minute wet well <br /> mounted pumping station. This lift station serves subdistrict 21, which is projected to <br /> generate .026 million gallons per day or a peak flow of 75 gallons per minute. <br /> Lift Station No. 3 — Lift Station No. 3 is located in the alley north of County Road E2 <br /> between 2nd and 3rd Avenues Northwest. This is a 75 gallon per minute wet well mounted <br /> pumping station. Lift Station No. 3 serves subdistrict 22 which is projected to generate .008 <br /> million gallons per day or a peak flow of 25 gallons per minute. <br /> Lift Station No. 7 — Lift Station No. 7 is located near the Chateau Royal Apartments <br /> on Cleveland Avenue Southeast. Lift Station No. 7 is a 200 gallon per minute wet well <br /> mounted pumping station. This lift station serves subdistrict 1, which is projected to <br /> generate .003 million gallons per day or a peak flow of 85 gallons per minute. <br /> Lift Station No. 8 — Lift Station No. 8 is located in the alley west of New Brighton <br /> Road and north of 1st Street Southeast. Lift Station No. 8 is a small pneumatic ejecture with <br /> a capacity of 30 gallons per minute. Lift Station No. 8 serves subdistrict 2, which is <br /> projected to generate .002 million gallons per day and peak flow of 5 gallons per minute. <br /> Lift Station No. 10 — Lift Station No. 10 is located on the northeast corner of 14th <br /> Street Northwest and Old Highway No. 8. Lift Station No. 10 is a duplex centrifugal <br /> pumping station with a capacity of 500 gallons per minute. This lift station serves <br /> subdistricts 25, 26, 27, and 28 which are projected to generate .071 million gallons per day <br /> and peak flow of 200 gallons per minute. <br /> There appears to be no problem with the lift stations as far as capacity; however, lift <br /> stations are mechanical devices which use a considerable amount of electrical energy and <br />
The URL can be used to link to this page
Your browser does not support the video tag.