My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 09191995
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
1995
>
PL PACKET 09191995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 5:30:43 PM
Creation date
12/30/2015 5:30:23 PM
Metadata
Fields
SP Box #
20
SP Folder Name
PL PACKETS 1995
SP Name
PL PACKET 09191995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 4 TRANSPORTATION 92 <br /> RAILROADS <br /> Two railroad lines pass through and serve New Brighton. The Soo Line Railway <br /> Company has a mainline track with trains passing through frequently. The track formerly <br /> owned by the Minnesota Transfer Railway Company serves New Brighton on a less frequent <br /> basis and the tracks end in communities that border New Brighton. In most instances, the <br /> track-street crossings are at grade and do not have signals, but just a crossbar warning. (See <br /> Map 14.) <br /> OBJECTIVE: RAILROADS <br /> Provide for the safe and efficient use of railroads by marling all railroad crossings of <br /> minor arterials and collectors with a flashing signal. <br /> POLICY: RAILROADS <br /> Install flashing signals at all railroad crossings of collectors and minor arterials at the <br /> time the affected roads are rebuilt. �b <br />
The URL can be used to link to this page
Your browser does not support the video tag.