Laserfiche WebLink
25 <br /> 1 CITY OF ST. ANTHONY <br /> PARKS COMMISSION MEETING MINUTES <br /> `. MAY 1,2000 <br /> ., 6:30 p.m. Tower Park <br /> 5 7:00 p.m. Conference Room <br /> 6 I. CALL TO ORDER. <br /> 7 Chair Jindra called the meeting to order at 7:29 p.m. She wished to note for the record that the <br /> 8 Commission, Augie Wong (BRW, Inc.) and Bob Kost (BRW, Inc.) met at Water Tower Park at <br /> 9 6:30 p.m. <br /> 10 II. ROLL CALL. <br /> 11 Present: Chair Carol Jindra, Vice Chair Doug Koehntop, Commissioners George <br /> 12 Wagner(left at 7:50 p.m.), Julie Gebhardt, Colleen Hallada, Daniel <br /> 13 Ganley, and Jan Jensen. <br /> 14 Also Present: Representative from School Board(Denise Dunn); Representative from <br /> 15 Sports Boosters (George Zurbey); Public Works Director(Jay Hartman); <br /> 16 City Council Liaison(Brian Thuesen). <br /> 17 A representative from Community Services was not present. <br /> • III. APPROVAL OF APRIL 10, 2000 PARKS COMMISSION MEETING MINUTES. <br /> Motion by Wagner, seconded by Hallada, to approve the minutes of the April 10, 2000 Parks <br /> 20 Commission meeting as presented. <br /> 21 Motion carried unanimously. <br /> 22 IV. DISCUSS CENTRAL PARK REDEVELOPMENT AND TOWER PARK PUNCH LIST <br /> 23 ITEMS. <br /> 24 Chair Jindra reviewed the color options for the repainting of the arches at Water Tower Park. <br /> 25 After discussion about the recommended colors of tan,red, and burgundy, consensus was to <br /> 26 approve burgundy. Jindra noted the paint was matched to the existing park equipment and <br /> 27 requested Augie Wong, BRW, Inc. to inform the Board of the price. <br /> 28 The issues remaining on the punch list for Water Tower Park were reviewed, which are as <br /> 29 follows: <br /> 30 1. Repainting of the metal arches as discussed above. <br /> 31 2. The metal gates will be spot-checked. <br /> 32 3. Anything loose on the retaining wall will be glued. <br /> 33 4. Cracks and ripped concrete on the concrete sidewalk will be taken care of Cracked sides <br /> 4 on the handicap ramp will also be redone. A 4 x 8 slab will be added by the glider. <br /> 5. The basketball area will be paved. <br /> 6. The bathroom pavement will be redone at the cost of Arrigoni Brothers. <br /> 37 7. Fabric is coming apart by the slide in the playground area, it will be checked to see if it is <br />