My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 08012000
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2000
>
PL PACKET 08012000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:37:32 PM
Creation date
12/30/2015 7:37:15 PM
Metadata
Fields
SP Box #
27
SP Folder Name
PL PACKETS 2000-2004
SP Name
PL PACKET 08012000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL-11-00 TUE 13:35 HILLCREST DEVELOPMENT FAX NO 3782424 P. 06 <br /> Mr. Hoff Heiberg -5- July 7,2000 <br /> CONCLUSIONS <br /> Based on the information previously presented in this memorandum, we have established <br /> the followine conclusions: <br /> • The traffic system serving the Apache Plaza Site was designed to <br /> accommodate substantial traffic volumes,with several high capacity access <br /> points serving the site both to/from Silver Lake Road and Stinson Boulevard_ <br /> • The net daily trips ends generated by the proposed redevelopment will be 13% <br /> lower than the net daily trip ends generated by the original development <br /> (11,510 as compared to 13,242) <br /> • The net p.m. peak hour trip ends generated by the proposed redevelopment <br /> will be only 3%higher than the net p.m. peak hour trip ends generated by the <br /> original development(1,324 as compared to 1,290) <br /> Given the preceding findings, we are confident that the traffic impacts caused by <br /> the proposed redevelopment will not be any greater than experienced under the <br /> original development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.