My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 08012000
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2000
>
PL PACKET 08012000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:37:32 PM
Creation date
12/30/2015 7:37:15 PM
Metadata
Fields
SP Box #
27
SP Folder Name
PL PACKETS 2000-2004
SP Name
PL PACKET 08012000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL-11-00 TUE 13:32 HILLCREST DEVELOPMENT FAX N0. 3782424 P. 02 <br /> BENSHOOF & ASSOCIATES, INC. <br /> TRANSPORTATION ENGINEERS AND PLANNERS <br /> 10417 EXCELSIOR BOULEVARD,SUITE TWO/HOPIaNS,MN 55343/(952)238-1867/FAX(952)238-1871 <br /> July 7, 2000 Refer to File: 0048 <br /> MEMORANDUM <br /> ✓�L <br /> TO: Hoff Heiberg,Hilkrest Development <br /> FROM: James A. Benshbof and Paul D. Klappa <br /> RE: Traffic Review for Proposed Redevelopment of Apache Plaza in City of <br /> j Saint Anthony <br /> PURPOSE AND BACKGROUND <br /> This memorandum is to address the trip generation implications of the proposed <br /> redevelopment of Apache Plaza in the City of Saint Anthony. The site is located in the <br /> northwest quadrant of the intersection of Silver Lake Road with 371i Avenue, Apache <br /> Lane circumferences most of the site. Apache Plaza was once a thriving sub-regional <br /> shopping center. However,the core of the shopping center has suffered severe decline <br /> and is predominantly vacant. Portions of the site have been split off for other <br /> developments. It is the intent of the developer to remodel or replace the remaining core <br /> with high tech office space. Based on conversations with the developer, our work is to <br /> address traffic questions of the City regarding the change in usage from retail to office. <br /> The scope of our work is to compare the traffic generated by the site following the <br /> redevelopment into high tech office space with the traffic that was generated by the site <br /> when the shopping center was in prime operating condition. <br /> On Monday June 19, 2000, we visited the Apache Plaza site to inventory the existing <br /> developments. We also made observations of the traffic facilities within the site and on <br /> the surrounding roadway system. <br /> Original Site Characteristics <br /> Based on information provided by the developer, our site visit, and other research,the <br /> original development consisted of the following: <br /> Shopping center of 450,000 square feet of gross floor area plus a 100,000 <br /> square foot finished basement. Of the 450,000 gross square feet, 800/6 or <br />
The URL can be used to link to this page
Your browser does not support the video tag.