My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 07212001
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2001
>
PL PACKET 07212001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:38:58 PM
Creation date
12/30/2015 7:38:34 PM
Metadata
Fields
SP Box #
27
SP Folder Name
PL PACKETS 2000-2004
SP Name
PL PACKET 07212001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.5 Apache Plaza Demolition <br /> Hammel Green and Abrahamson was retained to provide an estimate of the costs of <br /> ■ demolishing the existing Apache Plaza Mall, clearing the associated parking areas and <br /> preparing the site for redevelopment. The following chart provides a summary of cost <br /> elements of the demolition and site preparation. <br /> • Apache Plaza Building Characteristics <br /> Ground Floor Area: 1335,000 sq. ft. <br /> (including Herberger's approx. 48,000 sq. ft. and <br /> public spaces, including atrium, 185,000 sq. ft.) <br /> Basement Floor Area: pprox. 131,000 sq. ft. <br /> Mezzanine Level, Southeast corner pprox. 23,000 sq. ft. <br /> The principal environmental concerns revealed in the demolition cost <br /> estimate procedure involve the abatement of asbestos containing building <br /> materials. <br /> Apache Mall Demolition Cost Estimates <br /> Costs Components: <br /> General Requirements $220,898 <br /> Demolition $3,151,363 <br /> Clearing of Site $297,297 <br /> Excavation, Grading and Backfill $683,295 <br /> Site Drainage and Utilities $113,523 <br /> Roads and Walks $25,494 <br /> Lawns and Plantings $108,292 <br /> Plumbing Systems and Equipment $6,200 <br /> HVAC Systems and Equipment $12,000 <br /> Electrical Systems and Equipment $20,500 <br /> Construction Contingency $231,943 <br /> Contractor Fees, Bonds and Insurance $372,970 <br /> Project Escalation $209,751 <br /> Estimate Totals $5,453,526 <br /> Costs estimates current as of December,2000 <br /> See full report for further details. <br /> o� & X <br /> Northwest Quadrant Redevelopmerit Plan St. Anthony Village Page 2.7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.