Laserfiche WebLink
Parks Commission Meeting Minutes <br /> • October 10,2001 <br /> Page 5 <br /> 1 Chair Jindra asked what Hubmer recommended. Hubmer recommended a one and a half percent <br /> 2 slope without drain tile: <br /> 3 Commissioner Wagner clarified that drain tiles were not a part of the specifics right now. <br /> 4 Jensen stated he thought that they should stick with the design the way that it is today. <br /> 5 Hubmer indicated that they could install drain tile in the trails and, if eventually necessary,they could b, <br /> 6 installed in the fields with reasonable ease. <br /> 7 Wong indicated that they would need at least 1500 feet of drain tile for the entire trail, which would <br /> 8 cost about$60,000. <br /> 9 Hubmer stated that the Commission could determine a price that they were willing to spend on the drair <br /> 10 tile for the trail,then see what a contractor comes up with for a bid. <br /> 11 Zurbey asked who would be at fault if the field were soggy after rain. Anderson indicated that <br /> 12 extremely heavy rains are going to produce soggy fields. He added that if an inspector gets the base <br /> 13 graded-properly,they unlikely would have a problem. <br /> 14 Chair Jindra re-asked who was responsible for soggy fields after$2,300,000 was spent on the project. <br /> 15 She received the same answer that did not determine blame, but, instead, importance that the inspector <br /> 16 does his job well. <br /> 17 Anderson indicated that a one and a half percent grade should be sufficient. <br /> 18 Jenson indicated that the suggestion from the contractor to add drain tile was a way to up-sell them <br /> 19 unnecessarily. <br /> 20 Commissioner Gebhardt stated that she felt that they have gone to the City Council too many times <br /> 21 asking for money, and that they should not go back when the project is finished and ask for money for <br /> 22 drain tile. She added that they either needed to determine that the drain tile was necessary now, and <br /> 23 come up with the money, or have the confidence that the grading will be done properly. <br /> 24 Hartman indicated that they could not go back to the City Council for more money. <br /> 25 Chair Jindra asked Commissioner Gebhardt if she thought that they needed to find a way to pay for the <br /> • 26 drain tile now. Commissioner Gebhardt indicated she was concerned about the issue arising and that <br /> 27 they needed to get it right the first time. <br />