My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08231983
StAnthony
>
City Council
>
City Council Packets
>
1983
>
CC PACKET 08231983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:52:02 PM
Creation date
12/30/2015 3:51:48 PM
Metadata
Fields
SP Box #
16
SP Folder Name
CC PACKETS 1981-1984 & 1987
SP Name
CC PACKET 08231983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br /> DATE: September 27, 1983 <br /> TO: David Childs , City Manager <br /> Mayor and Councilmen <br /> FROM: Larry Hamer, Public Works Director <br /> SUBJECT: Sanitary Sewer Repair - Edward Street <br /> ---------------------------------------------------------------------- <br /> As you are aware, the City Council recently approved the repair of <br /> the subject sewer pipe by inserting a resin liner, at an estimated <br /> cost of $40 . 00 per foot (approximately 375 feet) . Following Council ' s <br /> approal of the process/price, the sales representative for the liner <br /> checked the taps, whereupon he indicated the areas where tile was <br /> missing had to be repaired before the liner could be inserted, and <br /> it would not, however, be necessary to repair the cracks where the <br /> sewer is intact. <br /> The Public Works Department was only able to televise a portion of <br /> the pipe and discovered three areas of that portion needed to be <br /> repaired. Most of the line could not be observed due to obstructions <br /> in the pipe . The original pipe was installed extremely deep and an <br /> outside contractor had to be called in to do the digging so the <br /> remainder of the pipe could be televised. Even though every effort <br /> was made to save as much of the road as possible , most of it had <br /> to be torn up because of the extreme depth of the pipe. <br /> Final televising of the pipe showed three more repairs were needed. <br /> Cost of these three repairs plus the insertion of the liner is <br /> estimated at $20 , 000 . <br /> RECOMMENDATION <br /> Because the road must be removed in any event, I recommend the Public <br /> Works Department install the new line at a higher depth (see attach- <br /> ment) . The estimated cost will be an additional $ <br /> This does not include replacement of the concrete road, which would <br /> be bid out after the disrupted area is settled. A temporary blacktop <br /> road could be installed by the Public Works Department after the <br /> construction is completed and until the road construction can commence . <br /> -- - ---.------- <br /> Upon further study of the area it was discovered the two houses on the <br /> north end of the project may be on an elevation which would prevent them <br /> from being able to be hooked into the new system. Until that specific <br /> area is dug up further, we cannot verify one way or the other; however, <br /> at this point, chances appear better than even the elevation of the two <br /> houses will prove to be alright to go ahead with the project as recom- <br /> mended. We will not proceed until it is a certainty, as this could <br /> alter the face of the entire project. <br /> LH/cjk <br />
The URL can be used to link to this page
Your browser does not support the video tag.