Laserfiche WebLink
gent solution in order to remove as• ject we generally,used two men plus sewer system.: In numerous <br /> much encrusted material'as possible: the public works director. It usually stances. riser pipes with loose-fitting <br /> Following the instructions care- took them 11/2 to 2 hours per manhole. lids or. no.lids at -all were located <br /> 1. <br /> fully, our department began by mix- Following application of the second where manholes were indicated on <br /> ing a fast-setting"plug"material to be'.. coat, a coat of "brush bond white" city sewer maps. These risers were <br /> inserted into any holes where water ' was applied over the.patch coat all the capped and-sealed to prevent inflow <br /> was present. The plug is a rock-like'. way to the top of the inside of the into the system. <br /> material that sets in about 45 seconds manhole. This acrylic modified ce- One final source of inflow was also <br /> —needless to say, very little is mixed- ment coating was intended to seal over eliminated:The roof drains of certain <br /> at any one time. Just a handful is the porous surface of the brick and buildings in Burlington were found to <br /> mixed to a stiff dough-like consistency mortar above the ordinary level of the be illegally tied into..the sanitary <br /> and quickly pushed firmly into the water table. Finally, after another 24 sewer system. The town board as- <br /> hole or crack. The workers wore hours, a coat of "brush bund grey"' sisted in ordering disconnection of- <br /> elbow-length rubber gloves in the was applied over the entire inside these drains from; the community's <br /> handling and installing of this material surface of the manhole, completing. sewer system. <br /> to avoid possible caustic burns on . the process of sealing the inside of the The final cost in labor and materials <br /> bare skin. manhole against water penetration. for the 24 manholes involved in the <br /> Once all the holes and cracks with The problem of inflow from the sur- rehabilitation project was approxi- <br /> active leaks were sealed and allowed face through the lid of the manhole mately$225 per manhole. In contrast, <br /> to dry (usually one day), the second was taken care of in one of two ways. repairing the manholes from the out- <br /> "patch plug"was applied to-the entire If the manhole was buried beneath a side would have cost.closer to $300 <br /> inside surface of the manhole to a street or in a field and will seldom be each, not including the disruption to <br /> height above the ordinary level of the entered, the lid was simply sealed the public that open excavation in the <br /> water table. The patch coat was with a thick coat of plastic asphalt roof roadway would have caused. If a <br /> applied to the bottom 4 to 6 feet of all coating. If the manhole must be more sewer guard cap was required,it was <br /> manholes treated. This 1/4-in. thick accessible, a bowl-shaped fiberglass an extra $100 to supply and install <br /> second coat was troweled over the "sewer guard"cap was placed under them. <br /> brick to a-firm smooth coat and al- the manhole cover. The seiner.guard We have been constantly checking <br /> lowed to dry for 24 hours. The man- has a seal around the lip to prevent the manholes and thus far, even in <br /> holes were opened and aired for 24 inflow, a pressure release valve to very wet weather they have been <br /> hours before being entered, and left allow air and/or gas from within the holding up well. Significant reduc- <br /> open between coats in order to facili- manhole to escape without letting in tions in I&I have been noted much to <br /> tate drying and to help prevent the water, and a vacuum compensation the delight of the sewage treatment <br /> accumulation of sewer gas. A port- valve to let air into the manhole with plant personnel. ❑❑❑ <br /> able air-blower and a safety line at- changes in air pressure. <br /> tached to the man doing the work in This completes the manhole re- Acknowledgement. This article is <br /> the manhole was a recommended habilitation process. In addition we based on a feature that appeared in <br /> safety precaution. Two men working have been using a magnetic dip-type the Winter 1984-1985 issue of Drip,the <br /> 20 to 30-minute shifts-were also part of metal locator to attempt to find all publication of the Oklahoma Water <br /> the safety requirements. In our pro- manholes and risers in the Burlington and Pollution Control Association. <br /> O <br /> Preco Industries Ltd a 55 Skyline Drive o Plainview, New York 11.803 . <br /> TO L•L FREE: 600645-3.95:4 <br /> NEW YORK: 516/935-9100. <br />