Laserfiche WebLink
PAGE NINE <br /> ST. ANTHONY HIGH SCHOOL : COST ESTIMATE <br /> LOWER LEVEL UNITS COST/UNIT <br /> NEW BOYS TOILET <br /> General <br /> 1. New Walls (gypboard) 800 sq.ft. 3.50 2800 <br /> 2. Q.T. Floor 250 sq.ft. 5.00 1250 <br /> 3. C.T. Walls 600 sq.ft. 4.00 2400 <br /> 4. 2 New doors 1000 <br /> 5. TO1 ACC. 800 <br /> 6. TO1 Partitions 5 300 1500 <br /> 9750 <br /> Mechanical <br /> 1. Add (7) new fixtures. <br /> 2. Provide waste, vent, water <br /> piping. and insulation. <br /> 3. Provide toilet exhaust. <br /> 4. Revise radiation/controls. <br /> 5. Balance supply air. <br /> 6. Cutting and patching. <br /> Cost Estimate 8000 <br /> Electrical <br /> 1. Add 4 new light fixtures and one <br /> duplex receptacle. <br /> 2. Disconnect and remove existing <br /> light fixture in way of new <br /> construction. <br /> Cost Estimate 750 <br /> GRAPHIC ARTS <br /> General <br /> 1. Relocate Equipment 5 500.00 2500 <br /> 2. Darkroom Sink 1 - 1000 <br /> 3. Darkroom Walls 750 sq.ft . 3.50 2600 <br /> 4. Darkroom Ceilings 170 sq.ft. 1.50 250 <br /> 5. Darkroom Floor 170 sq.ft . 4.00 700 <br /> 6. Ceiling Patch for <br /> Electrical Work 300 <br /> 7. Floor Tile Patching 200 1 .50 300 <br /> • 7650 <br />