Laserfiche WebLink
Proposal <br /> HR®C Construction - <br /> e <br /> 1001 , East 24th Street Proposal No.: 10930 <br /> Unneap®9is,'MN 55404 Date: April 29, 1987 <br /> o. <br /> 0 (612) 674-0100 <br /> Proposal Submitted To Work To Be Performed At <br /> Name City of St. Anthony Street City Offices/Silver Lake Road <br /> Street 3301 Silver Lake Road city St. Anthony state Mn. <br /> City St. Anthony Date of Plans <br /> State Minnesota 55418 Architect <br /> Telephone Number 789-8881 Larry Hamer <br /> We hereby propose to furnish all the materials and perform all the labor necessary for the completion of <br /> r <br /> SEE ATTACHED SHEET FOR BREAK-DOWN <br /> All material is guaranteed to be as specified, and the above work to be performed in accordance with the drawings and <br /> specifications submitted for above work and completed in a substantial workmanlike manner for the sum of <br /> Dollars($ 56,250.00 Y <br /> with payments to be made as follows: <br /> To hp nenntiated upon acceptance of contract <br /> Any alteration or deviation from above specifications involving extra costs,will be executed only upon written orders,and will <br /> become an extra charge over and above the estimate.All agreements contingent upon strikes,accidents or delays beyond our <br /> control.Owner to carry fire,tornado and other necessary insurance upon above work.A service charge of 11/°2%per month <br /> shall be charged on any required payment that is 5 days over due. If required by contractor to commence legal action to <br /> enforce any terms of this contract, owner specifically agrees to pay all costs associated with the legal action, including <br /> attorney fees.Any and all warranties become null and void if contract is not paid according to the terms herein.This contract <br /> price was based upon the provision that with the exception of manufacturers warranties any warranties.provided solely by <br /> Contractor shall be limited to the repair or replacement of the work contained in the contract,no consequential damages will <br /> be.covered.Contract makes no other warranty expressed or implied. <br /> Per H.R.D.C. CONSTRUCTION Respectfully Submitted Wayne Payne <br /> Note—This proposal may be withdrawn by us if not accepted within 30 days- <br /> ACCEPTANCE. OF PROPOSAL <br /> The above prices,specifications and conditions are satisfactory and are hereby accepted.You are authorized to do the work <br /> as specified. Payment will be made as outlined above. <br /> • Accepted Signature <br /> Date Signature <br />