My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08111987
StAnthony
>
City Council
>
City Council Packets
>
1987
>
CC PACKET 08111987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:23:14 PM
Creation date
12/30/2015 4:22:58 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 08111987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
northern <br /> PIMAing l8finll-hm 14327-28th Place North Minneapolis; Minnesota 55441 (612) 559-4344 <br /> MECHANICAL CONTRACTORS <br /> July 30, 1987 <br /> Mr. Larry Hammer <br /> City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418 <br /> RE: Boiler Replacement - 3301 Silver Lake Road <br /> Dear Mr. Hammer: <br /> After reviewing the drawings you gave me, and inspecting the existing heating <br /> system at your building, we offer the following for your consideration. <br /> For the existing air handler, we will furnish and install a two (2) module hot <br /> water boiler, with a capacity of 750. MBH input, 600 MBH output. The steam <br /> piping will be disconnected, the boiler will be installed adjacent to the air <br /> handler, and the boiler will be connected to the existing coil in the air handler. <br /> The first boiler will be controlled by an indoor-outdoor thermostat, with the <br /> second boiler controlled by an outdoor thermostat. The boiler will include <br /> electronic ignition, vent dampers, and a duplex pump package to circulate the <br /> hot water thru the coil. <br /> Total Price for this System: $16,550.00 . <br /> In the existing boiler room, we-propose to furnish and install a five module boiler <br /> unit, with a total of 1,875,000 BTUH input and 1,500,000 BTUH output. Included <br /> in this part of the project will be necessary gas piping, temperature control, <br /> connection to existing piping, and modifications to existing radiation as required <br /> to convert from steam to hot water. This boiler will have five (5) steps of con- <br /> trol and will 6e very energy efficient:._ <br /> Total: $27,550.00 <br /> Alternate #1 - To remove existing boilers. Add: $6,877.00 <br /> Notes: <br /> l. - All work to be performed on regular tune. <br /> 2. We assume that the existing steam piping is adequately sized for the supply <br /> and return hot water piping. This must be verified'.by a registered engineer: <br /> We include the cost of this study in our proposal, but we do not include the <br /> cost to .change supply or return piping. <br /> 3. Necessary permits are included in our proposal.. <br /> Sincerely, <br /> NORTHERN PLUMBING & HEATING, INC. ' <br /> James L. Busscher <br />
The URL can be used to link to this page
Your browser does not support the video tag.