My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 11101987
StAnthony
>
City Council
>
City Council Packets
>
1987
>
CC PACKET 11101987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:25:50 PM
Creation date
12/30/2015 4:25:34 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 11101987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 The 'Attorney and-Consultant discussed -�-he missing. sections of the • <br /> 2 - Redevelopment Contract with the redevelopers who the , Executive <br /> 3 Director indicated would now be, referred to as. the Wilson Street <br /> 4 Associates with Mr. Gaughan personally signing as the general partner <br /> 5 and submitting the $360 ,000 Letter of Credit guaranteeing the <br /> 6 development in the agreed upon period. <br /> 7 Mr. Krier said the redeveloper was being asked to provide the <br /> 8 drawings of buildings. and site improvements according to the survey, <br /> 9 which is almost completed. The architectural renderings would then <br /> 10 become a part of the contract and would also be taken to the Hennepin <br /> 11 County Assessor to set a minimum value on the property, of which he <br /> 12 said the City already had a pretty good estimation. The Consultant <br /> 13 indicated the schedule was already in , the contract and it was only <br /> 14 left to the redeveloper to .provide an administrative type document <br /> 15 which would be easier to read. <br /> 16 Mr. Krier stated that in terms of any of the above missing items , he <br /> 17 did not perceive a need for delaying the approval of the Contract <br /> 18 that evening because the H.R.A. Chair and the Executive Director <br /> 19 would not sign the document until all necessary documentation is <br /> 20 provided. The Consultant indicated he perceived it was important to <br /> 21 keep the process going and to lock in lower interest rates as fast as <br /> 22 can be done. He said the hope was that the Redevelopers Contract <br /> 23 could be signed by the end of the week. <br /> 24 Mr. Soth recommended making the approval contingent on the City • <br /> 25 Council approving the modified P.U.D. on the project on which both <br /> 26 the Planning Commission and Council would be required to hold public <br /> 27 hearings . He added that the description of the development, which <br /> 28 would be general in the contract, would be nailed down more specifi- <br /> 29 cally in the P.U.D. <br /> 30 Mr. Krier reiterated that the meeting with the people from the <br /> 31 Minneapolis triangle closest to St. Anthony would be held in the St. <br /> 32 Charles Borromeo school the following Monday, but because a lot of <br /> 33 time has already been spent talking to the Minneapolis people, no <br /> 34 major opposition was anticipated at that meeting. Mr. Childs <br /> 35 confirmed that all St. Anthony property owners who had been sent <br /> 36 notices of the Planning Commission October 20th public hearing on the <br /> 37 P.U.D. had also been invited to attend the October 19th informational <br /> 38 meeting at St. Charles where he perceived more questions could be <br /> 39 answered than at a public hearing. <br /> 4-0 Commissioner Ranallo reiterated that he would be attending the Monday <br /> 41 evening meeting at the request of Alderman Dziedzic , who perceived it <br /> 42 was very important to have the informal meeting with -the neighbors <br /> 43 before the public hearing. The consensus was that Mr. Childs should <br /> 44 also attend that meeting. <br /> 45 Mr . Krier indicated he perceived the issues raised at the Monday <br /> 46 meeting would be mostly design oriented requiring the presence of the • <br /> 47 redevelopers ' president and architect but not the Attorney. <br /> I <br /> 2 <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.