My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10111988
StAnthony
>
City Council
>
City Council Packets
>
1988
>
CC PACKET 10111988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:32:44 PM
Creation date
12/30/2015 4:32:29 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 10111988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADVANCED <br /> MECHANICAL CONTRACTORS <br /> 7805 BEECH STREET NORTHEAST MINNEAPOLIS, MN 55432 612-571-4881 <br /> TO: Mr. Bruce Holton BUILDING: Same (Fire Department Building) <br /> LOCATION: St. Anthony Village <br /> ADVANCED MECHANICAL CONTRACTORS,' INC. proposes to furnish, for the above project, all materials, <br /> labor and equipment and to perform all work for the <br /> THIS PROPOSAL is based on the plans, specifications"and addenda as received and which were prepared by: <br /> and dated: <br /> INCLUSIONS Labor and materials to install the H.V.A.C. as per plan by Dick <br /> Johnson and Bruce Holton. <br /> Includes: Labor, materials, gas piping, demolition of existing unit <br /> and ductwork. Permits, inspection fees, start up and balancing of <br /> • system. <br /> EXCEPTIONS H.V.A.C. equipment supplied by others. <br /> FOR THE SUM OF: S 13,200.00 ( THIRTEEN THOUSAND TWO HUNDRED <br /> AND 00/100 Dollars----___---------------------- <br /> ADD <br /> ALTERNATE 1. DEDUCT $ <br /> ADD <br /> 2. DEDUCT S <br /> THIS PROPOSAL SHALL BECOME NULL AND VOID IF NOTICE OF ACCEPTANCE IS NOT RECEIVED WITHIN DAYS <br /> OF THE BELOW LISTED PROPOSAL DATE. ALL MATERIAL PURCHASED AND ALL LABOR PERFORMED DURING ANY ONE (1) <br /> CALENDAR MONTH,SHALL BE DUE AND PAID BY THE 10TH OF THE CALENDAR MONTH FOLLOWING.IF THE CONTRACT CANNOT <br /> • BE COMPLETED BY ,ANY AND ALL COST INCREASES OF MATERIALS AND LABOR SHALL BE ADDED <br /> TO THE ORIGINAL CONTRACT PRICE WITH THE EXPRESSED AUTHORIZATION OF THE SIGNATORIES HEREIN. <br /> ACCEPTED: ADVANCED MECHANICAL CONTRACTORS <br /> BY: TITLE: BY: <br /> varis e Bedard <br /> DATE: PROPOSAL DATE: October 3, 1988 <br /> An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.