My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 02281989
StAnthony
>
City Council
>
City Council Packets
>
1989
>
CC PACKET 02281989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:35:19 PM
Creation date
12/30/2015 4:35:04 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 02281989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br /> Aerial Unit Specifications • <br /> Compliance Check List GEMINI - Upper boom travel Arc 2100 (Overcenter) <br /> Lower boom travel Arc 1381 (Overcenter) <br /> Yes R2 Item <br /> 1. 50' aerial basket to have 55' working height. <br /> TECO GEMINI G5-45 45 ft./ 50 ft working <br /> _ 2. Fiberglass insert in lower boom to have at <br /> least 24" gap. Fiberglass upper boom tested <br /> to A.N.S.I. A 92. 2 for 69 KV. 18" gap. <br /> _ 3. Aerial unit rotation .to be continuous and <br /> unrestricted in either direction. <br /> X _ 4. 3 lever full pressure basket controls (slave <br /> type system not acceptable) . <br /> X _ 5. Bucket to be single side mount with a 350 lb. <br /> platform capacity in all positions and have a <br /> single inside and outside step. <br /> X _ 6. One set of hydraulic tool outlets at boom tip <br /> with quick couplers and dust caps, H.T.M.A. <br /> approved. <br /> X _ 7. Bucket leveling to be automatic and maintain • <br /> dialectric qualities. <br /> X _ 8. Date of aerial certification nate of Mfg <br /> X 9. Aerial to be powered by closed center <br /> pressure compensated pump with adequate size <br /> reservoir and pump to allow safe operation <br /> without loss of productivity for hydraulic <br /> tools and aerial. Piping must be adequate to <br /> return without backup or restruction. gear O.C. Pump <br /> X _ 1.0. Aerial to have emergency power system in the <br /> event of aerial hydraulic failure. <br /> X _ 11. Throttle controls manual, two speed throttle. <br /> X _ 12. Stowed height of lift, low profile desired <br /> 10'6" <br /> X _ 13. Pedestal of the aerial must be mounted over <br /> rear axle. <br /> X _ 14. Engine start/stop from platform. <br /> X _ 15. Provide safety belt and lanyard. • <br />
The URL can be used to link to this page
Your browser does not support the video tag.