My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10101989
StAnthony
>
City Council
>
City Council Packets
>
1989
>
CC PACKET 10101989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:39:12 PM
Creation date
12/30/2015 4:38:58 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 10101989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• STAFF MEETING NOTES <br /> OCTOBER 3, 1989 <br /> The- meeting began at 10:10 a.m. Those present were Larry Hamer, <br /> Don Hickerson, Ray Nelson, Lee Entner, Connie Kroeplin, and Sue <br /> VanderHeyden. <br /> Don Hickerson <br /> 1. Chief Hickerson. expects the re-lettering on the squads to be <br /> completed today. <br /> 2. The recent Neighborhood Crime Watch meeting held by Apache <br /> Court residents was one of the largest attended in the <br /> Village. <br /> Ray Nelson <br /> 1 . KSTP-TV will be filming a promotional spot for the <br /> Timberwolves tonight at the Stonehouse. <br /> 2 . Work at the Apache Wells has had some delays, but is <br /> • progressing nicely now. <br /> Larry Hamer <br /> 1. An engineering firm from the MPCA has installed a monitoring <br /> device on the easterly side of the Kenzington and has not <br /> found groundwater contamination in that area. <br /> 2 . Jim Brost, who had back surgery, will return to work in 3 or <br /> 4 weeks. <br /> 3. The aerial unit is ready and tree trimming will be done <br /> throughout the Village until it snows. The streets will be <br /> swept as needed. <br /> 4. The new Evergreen owner, Nedegaard Construction, expects the <br /> project to be completed by December, 1990. <br /> 5. A new leaf recycling unit has been ordered. The leaves will <br /> need to be hauled away at a cost of $95/hour. It takes about <br /> two hours each time the leaves are hauled away. <br /> 6. Specifications for new iron removal filters are - being <br /> prepared. <br /> 7. The sprinkling ban has been lifted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.