My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 07271993
StAnthony
>
City Council
>
City Council Packets
>
1993
>
CC PACKET 07271993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2016 1:43:55 PM
Creation date
12/30/2015 8:24:23 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 07271993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REGULAR COUNCIL MEETING <br /> JULY 13 , 1993 <br /> 3 PAGE 12 <br /> 4 <br /> 5 <br /> 6 There is a Bon Voyage party on July 15th for Dave Childs , who <br /> 7 is leaving the position of City Manager at New Brighton . <br /> 8 <br /> 9 Some members of the Council had noticed the pumps had been <br /> 10 removed at the Stop-N-Shop on 33rd Avenue and Stinson <br /> 11 Boulevard. When the owner came before the Council requesting <br /> 12 a variance part of his problem was because he felt the cost to <br /> 13 move the pumps would be prohibitive. <br /> 14 <br /> 15 The City Manager advised that the location of the pumps when <br /> 16 they are being re-installed will be the same as the former <br /> 17 location . New tanks are being put in to meet some Pollution <br /> 18 Control Agency requirements . <br /> 19 <br /> 20 8 . PUBLIC HEARINGS <br /> 21 <br /> 22 There were no public hearings . <br /> 23 <br /> 24 9 . NEW BUSINESS <br /> 25 <br /> 46 A. Change Order # 2 for Water System Improvements <br /> 28 This change order will allow for the installation of a limit <br /> 29 switch control system, a control panel modification and <br /> 30 additional conduit for the booster pumps and the pumphouse <br /> 31 installation . This will allow the system operator better <br /> 32 information regarding the existing control panel . The <br /> 33 modification will allow the booster pumps to operate as a well <br /> 34 from the existing well #7 control module in the existing <br /> 35 filtration plant control panel . Total cost of the change order <br /> 36 is $943 . 84 . <br /> 37 <br /> 38 Motion by Marks , second by Enrooth to approve Change Order #2 . <br /> 39 <br /> 40 Motion carried unanimously <br /> 41 ' <br /> 42 B. Resolution No. 93-040 , Re: Development Agreement with <br /> 43 Unocal <br /> 44 <br /> 45 City Attorney Soth reviewed the Development Agreement <br /> 46 specifically addressing the conveyance of a triangular piece <br /> 47 of property, there being no access onto 27th Avenue, and the <br /> 48 only access being on the "stub" street . <br /> 49 <br /> 50 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.