My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08241993
StAnthony
>
City Council
>
City Council Packets
>
1993
>
CC PACKET 08241993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:25:23 PM
Creation date
12/30/2015 8:25:03 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 08241993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACtt t ENT. ' c' <br /> The <br /> ARCHITECTURE <br /> PLANNING <br /> INTERIORS <br /> Mr.Thomas D. Burt <br /> City Manager <br /> City of St.Anthony Village <br /> 3301 Silver Lake Road <br /> St.Anthony,MN 55418 <br /> March 31,1993 <br /> Re: New Community Center <br /> Proposal for Architectural/Engineering Design Services <br /> Dear Mr. Burt: <br /> In order to clarify our fee proposal for the subject project the following is noted: <br /> We have quoted a not-to-exceed fee of$54,000.00 which is composed of <br /> A. Programming, <br /> Space Needs Analysis,Pre-Schematic <br /> Design,Preliminary Cost Estimate. $22,500.00 <br /> B. Schematic Design,including <br /> Architectural and Engineering <br /> design services. "$31,500.00 <br /> Schematic Design typically constitutes <br /> 15%of the complete basic <br /> Architectural and Engineering <br /> design services for a given project. <br /> "The$31,500.00 represents 15%of$210,000.00 <br /> which,in turn,represents a 7%A/E fee <br /> (of the$3,000,000.00 estimated construction <br /> budget)for complete basic design services <br /> (Schematic Design,Design Development, <br /> Construction Documents,Bid Assistance, <br /> Construction Administration). <br /> We interpreted your Request for Proposal to include Programming id Schematic Design <br /> because you requested a separate price for a model. (A model would typically be produced at <br /> the conclusion of Schematic Design to show the design concept three-dimensionally.) <br /> If you do not wish to complete the schematic design services at this time,you may revise our <br /> $54,000.00 not-to-exceed fee to$22,500.00 for programming,space needs analysis,pre-schematic <br /> design, and preliminary cost estimate. Reimbursable expenses would total approximately <br /> $500.00. <br /> 400 Clifton Avenue South,Minneapolis,Minnesota 55403-2132; 6121871-5703; Fax 612!871-7212 <br />
The URL can be used to link to this page
Your browser does not support the video tag.