My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08241993
StAnthony
>
City Council
>
City Council Packets
>
1993
>
CC PACKET 08241993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:25:23 PM
Creation date
12/30/2015 8:25:03 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 08241993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACT ITEMS THIS PERIOD TOTAL TO DATE <br /> ITEM ITEM DESCRIPTION <br /> NO. UNIT OTY. UNIT <br /> PRICE PRICE PRICE <br /> SCHEDULE 4.0 CROFT DRIVE RECONSTR. <br /> 1 REMOVE CONC. CURB&GUTTER LF 2077 $3.25 2073 $8,737.25 2073 $8,737.25 <br /> 2 ADJUST EX. MANHOLE CASTING EA 4 $130.00 0 $0.00 0 $0.00 <br /> 3 WATER FOR DUST CONTROL MGAL 15 $10.00 10 $100.00 10 $100.00 <br /> 4 COMMON EXCAVATION CY 3848 $5.30 3648 $19,334.40 3848 $19,334.40 <br /> 5 SUBGRADE PREPARATION RDSTA 10.02 $100.00 10.02 $1,002.00 10.02 $1,002.00 <br /> 6 GEOTEXTILE FABRIC SY 3430 $1.00 3430 $3,430.00 3430 $3,430.00 <br /> 7 SELECT GRANULAR BORROW(CV) CY 2290 $7.30 2290 $16,717.00 2290 $16,717.00 <br /> 8 4' PERF. (PE) CORR. PIPE DRAIN LF 2077 $3.00 2077 $8,231.00 2077 $8,231.00 <br /> 9 CLASS 5 AGGREGATE BASE TON 1150 $7.30 1150 $8,395.00 1150 $8,395.00 <br /> 10 2331.TYPE 318 BASE MIXUTRE TON 376 $24.00 0 $0.00 0 $0.00 <br /> 11 2331,TYPE 41A WEAR MIXTURE TON 282 $27.00 0 $0.00 0 $0.00 <br /> 12 BITUMINOUS TACK COAT GAL 150 $1.00 0 $0.00 0 $0.00 <br /> 13 8818 CONCRET CURB&GUTTER LF 2077 $5.20 1000 $5,200.00 1000 $5,200.00 <br /> 14 2' BIT. DRIVEWAY RESTORATION SY 77 $10.00 0 $0.00 0 $0.00 <br /> 15 8'CONC. DRIVEWAY RSTORATION SY 200 $22.00 0 $0.00 0 $0.00 <br /> 16 SAW CUT CONCRETE LF 420 $3.50 420 $1,470.00 420 $1,470.00 <br /> 17 CONCRETE DRIEWAY APRON SY 180 $22.00 0 $0.00 0 $0.00 <br /> 18 4"CONCRETE WALK SF 48 $2.30 0 $0.00 0 $0.00 <br /> 19 SELECT TOPSOIL BORROW CY 75 $10.00 0 $0.00 0 $0.00 <br /> 20 SOD, LAWN &BOULEVARD TYPE SY 3200 $1.40 0 $0.00 0 $0.00 <br /> 21 SUBGRADE TESTING LS 1 $200.00 1 $200.00 1 $200.00 <br /> 22 GRANULAR BORROW TESTIN LS 1 $800.00 1 $800.00 1 $800.00 <br /> 23 CLASS 5 AGGREGATE TESTING LS 1 $300.00 1 $300.00 1 $300.00 <br /> 24 BITUMINOUS PAVEMENT TESTING LS 1 $900.00 0 $0.00 0 $0.00 <br /> T SCHEDULE 4.0 CROFT DRIVE RECONSTR.-Total $69,916.65 $69,916.65 <br /> SCHEDULE 5.0 COOLIDGE&27TH AVE ST IMPROVE <br /> 1 REMOVE CONC. CURB&GUTTER LF 1300 $3.25 1000 $3,250.00 1000 $3,250.00 <br /> 2 REMOVE BITUMINOUS PAVEMENT SY 2050 $1.70 1500 $2,550.00 1500 $2,550.00 <br /> 3 EROSION CONTROL LF 800 $2.00 0 $0.00 0 $0.0 <br /> 4 COMMON EXCAVATION CY 2881 $5.30 0 $0.00 0 $0. <br /> 5 CLEAR 7 GRUBB TREE(OVER 6"DIA.) EA 5 $150.00 2 $300.00 2 $300. <br /> 6 SUBGRADE PREPARATION RDSTA 8.5 $200.00 0 $0.00 0 $0.00 <br /> 7 GEOTEXTILE FABRIC SY 2311 $1.00 0 $0.00 0 $0.00 <br /> 8 WATER FOR DUST CONTROL MGAL 10 $10.00 0 $0.00 0 $0.00 <br /> 9 SELECT GRANULAR BORROW(CV) CY 1540 $7.30 0 $0.00 0 $0.00 <br /> 10 4"PERF. (PE) CORR. PIPE DRAIN LF 1320 $3.00 0 $0.00 0 $0.00 <br /> 11 CLASS 5 AGGREGATE BASE TON 780 $7.30 0 $0.00 0 $0.00 <br /> 12 2331.TYPE 31 B BASE MIXTURE TON 255 $24.00 0 $0.00 0 $0.00 <br /> 13 2331,TYPE 41A WEAR MIXTURE TON 191 $27.00 0 $0.00 0 $0.00 <br /> 14 BITUMINOUS TACK COAT GAL 101 $1.00 0 $0.00 0 $0.00 <br /> 15 B818 CONCRETE CURB&GUTTER LF 1320 $5.20 0 $0.00 0 $0.00 <br /> 16 2" BIT. DRIVEWAY RESTORATOIN SY 24 $10.00 0 $0.00 0 $0.00 <br /> 17 8'CONC. DRIVEWAY RESTORATION SY 28 $22.00 0 $0.00 0 $0.00 <br /> 18 CONCRETE DRIVEWAY APRON SY 20 $22.00 0 $0.00 0 $0.00 <br /> 19 SELECT TOPSOIL BORROW CY 150 $10.00 0 $0.00 0 $0.00 <br /> 20 SEEDING ACRE 1 $1,200.00 0 $0.00 0 50.00 <br /> 21 SOD, LAWN&BOULEVARD TYPE S 3200 $1.50 0 $0.00 0 $0.00 <br /> 22 SUBGRADE TESTING LS 1 $200.00 0 $0.00 0 $0.00 <br /> 23 GRANULAR BORROW TESTING LS 1 $500.00 0 $0.00 0 $0.00 <br /> 24 CLASS 5 AGGREGATE TESTING LS 1 $200.00 O $0.00 0 $0.00 <br /> 25 BITUMINOUS PAVEMENT TESTING LS 1 $900.00 0 $0.00 0 $0.00 <br /> T SCHEDULE 5.0 COOLIDGE&27TH AVE ST.IMPROVE. $6,100.00 $6,100.00 <br /> SCHEDULE 8.1 STORM SEWER ALT, BID <br /> 1 REMOVE EXISTING RCP STORM SEWER LF 236 $4.00 238 $944.00 236 $944.00 <br /> 2 REMOVE EXIST. CB/MH STRUCTURE EA 10 $120.00 8 $720.00 8 $720.00 <br /> 3 15"HDPE LF 342 $19.00 218 $4,104.00 216 $4,104.00 <br /> 4 STD.STORM MANHOLE(48" DIA.) EA 5 $1,200.00 4 $4,800.00 4 $4,800.00 <br /> 8 STD. STORM MANHOLE(48" DIA.) EA 4 $1,200.00 2 $2,400.00 2 $2,400.00 <br /> 8 GRANULAR FOUNDATION MAT'L. TON 35 $10.00 20 $200.00 20 $200. <br /> T SCHEDULE 6.1 STORM SEWER IMPROVEMENTS-Total $13,188.00 $13,168.00 <br /> 490015.No1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.