Laserfiche WebLink
ARTICLE 5 <br /> with Paragraph 8.3; or <br /> CONSTRUCTION COST .4 operate in revising the Project scope. quality as <br /> 5.1 DEFINITION requ to reduce the Constructio ost. <br /> 5.1.1 The Construction Cost shall be the total cost or e-ti- 5.2.5 If the Owner uses to pro under Clause 5.2.4.4 <br /> mated cost to the Owner of all elements of the Project designed the Architect, without ad ' n large,shall modify the Con <br /> tract Documents as recess t mply with the fixed limit, i <br /> or specified by the Architect. <br /> established as a condi ' of this Ag ent. The modificatio <br /> 5.1.2 The Construction,Cost shall include the cost at current of Contract Do ents shall be the lit ' of the Architect' <br /> market rates of labor and materials furnished by the Owner and responsibilit • rising out of the establishmen a fixed limit <br /> equipment designed, specified, selected or specially provided The Ar ect shall be entitled to compensation in ordanc <br /> for by the Architect, plus a reasonable allowance for the Con- w' is Agreement for all services performed whether no <br /> tractor's overhead and profit. In addition, a reasonable allow- <br /> ance for contingencies shall be included for market conditions <br /> at the time of bidding and for changes in the V fork during <br /> construction. ARTICLE 6 <br /> 5.1.3 Construction Cost does not include the compensation of USE OF ARCHITECT'S DRAWINGS, <br /> the Architect and Architect's consultants, the costs of the land, SPECIFICATIONS AND OTHER DOCUMENTS <br /> rights-of-way, financing or other costs which are the respon- <br /> sibility of the Owner as provided in Article 4. 6.1 The Drawings, Specifications and other documents pre- <br /> RESPONSIBILITY FeReeN9TRtje9rffi0N eesT pared by the Architect for this Project are instruments of the <br /> Architect's service for use solely with respect to this Project <br /> .2.1 Evaluations of the Owner's Project budget, prelimi ry and, unless otherwise provided, the Architect shall be deemed <br /> e imates of Construction Cost and detailed estimates of on- the author of these documents and shall retain all common law, <br /> st tion Cost, if any, prepared by the Architect, represe t the statutory and other reserved rights, including the copyright. <br /> Arch ect's best judgment as a design professional famil' with The Owner shall be permitted to retain copies,including repro- <br /> the c struction industry. It is recognized, however, at nei- ducible copies, of the Architect's Drawings, Specifications and <br /> Cher th Architect nor the Owner-has control over a cost of other documents for information and reference in connection <br /> labor, m erials or equipment, over the Contracto s methods with the Owner's use and occupancy of the Project. <br /> of determ' ing bid prices,or over competitive bi ing,market not be <br /> or negotiati conditions. Accordingly, the Ar itect cannot used by er or others on other for additions to <br /> and does not arrant or represent that bids or gotiated prices this Project or for co �bein �with ect by others,unless <br /> will not vary om the Owner's Project bu et or from any the Architect is ad' tder this Agreement, <br /> estimate of Cons ction Cost or evaluation repared or agreed except eement in wppro ompen- <br /> to by the Archite OR so the Afehiteet. <br /> 5.2.2 No fixed lima of Construction C st shall be established <br /> Of di5IFibd1i814 OF Elfttiffleffl­9 19 Fiq 221 <br /> as a condition of this greement by th furnishing,proposal or egulatory req for sim' in connection <br /> establishment of a Pro' ct budget, u ess such fixed limit has ith the Pro' constru Lion in deroga- <br /> been agreed upon in w•n 'ng and sig ed by the parties hereto.I <br /> such a fixed limit has be establ' hed, the Architect shall be <br /> permitted to include con gen tes for design, bidding an <br /> price escalation, to deter in w at materials,equipment,com- <br /> ponent systems and types of c nstruction are to be included in <br /> the Contract Documents, t e reasonable adjustments in ARTICLE 7 <br /> the scope of the Project to i clude in the Contract Docu- ARBITRATION <br /> ments alternate bids to adj t the C traction Cost to the fixed <br /> limit. Fixed limits,if any hall be in eased in the amount of an 7.1 Claims, disputes or other matters in question between the <br /> increase in the Contra Sum occurr' after execution of the parties to this Agreement arising out of or relating to this Agree <br /> Contract for Constru ion. ment or breach[hereofXe subject to and decided by arbi- <br /> 5.2.3 If the Bid or Negotiation Ph as not commenced tration in accordance with the Construction Industry Arbitra- <br /> tion Rules of the American Arbitration Association currently in <br /> Documents to t Owner,any Project budg t or fixed limit o effect unless the parties mutually agree otherwise. <br /> Construction st shall be adjusted to refle changes in the - °- - - <br /> Oi eral level prices in the construction Indus between the 7.2 Demand for arbitration shall be filed in writing with the <br /> of su ission of the Construction Docu ents to the `other party to this Agreement and with-the American Arbitra <br /> ner an the date on which proposals are sou t. tion Association.A demand for arbitration shall be made within <br /> a reasonable time after the claim, dispute or other matter in <br /> 5.2.4 If fixed limit of Construction Cost (adjust d as pro- question has arisen.In no event shall the demand for arbitration <br /> vided ' Subparagraph 5.2.3) is exceeded by the low t bona be made after the date when institution of legal or equitable <br /> fide b' or negotiated proposal, the Owner shall: proceedings based on such claim, dispute or other matter in <br /> .1 give written approval of an increase in such ed question would be barred by the applicable statutes of limitations. <br /> limit; 7.3 No arbitration arising out of or relating to this Agreement <br /> .2 authorize rebidding or renegotiating of the Proje shall include,by consolidation,joinder or in any other manner, <br /> an additional person or entity not a party to this Agreement, <br /> AIA DOCUMENT 8141 •OWNER-ARCHITECT AGREEMENT•FOURTEENTH EDITION•AIA° •©1987 <br /> THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVENUE,N.W.,WASHINGTON,D.C.20D06 B141-1987 6 <br /> WARNING:Unlicensed photocopying violates U.S.copyright laws and Is subject to legal prosecution. <br />