My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08121997
StAnthony
>
City Council
>
City Council Packets
>
1997
>
CC PACKET 08121997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:34:38 PM
Creation date
12/30/2015 6:34:23 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 08121997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ., OWNER ❑ <br /> ORDER <br /> ARCHITECT <br /> O CONTRACTOR ❑ <br /> FIELD ❑ <br /> AIA DOCUMENT G701 OTHER ❑ <br /> PROJECT. Old St. Anthony City Hall & CHANGE ORDER NUMBER: 1 <br /> (name, address) Community Center Demolition <br /> Silver Lake Road and 33rd Ave NE DATE: August. 1, 1997 <br /> TO CONTRACTStR:Anthony, MN 55418-1699 ARCHITECT'S PROJECT NO: 9616 <br /> (name, address) CONTRACT DATE: <br /> DKH Excavating, Inc. June, 1997 <br /> 7700 Highway 101 CONTRACT FOR: Demolition <br /> Shakopee, MN 55379 <br /> The Contract is changed as follows: <br /> Remove and place contaminated soil per attached proposal: <br /> Backhoe at 125.00/hr <br /> Dozer at 95.00/hr <br /> Packer at 75.00/hr <br /> Mobilization at 900.00 <br /> Estimated cost is $3,850.00 <br /> Mot valid until signed by the Owner, Architect and Contractor. <br /> The original(Contract Sum)(Guaranteed Maximum Price)was . . . . . . . . . . . . . . . . . . . . . . . .8 166,850.00 <br /> Net change by previously authorized Change Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .S 0.00 <br /> The(Contract Sum)(Guaranteed Maximum Price)prior to this Change Order was. . . . . . . . . .S 166,850.00 <br /> The (Contract Sum)(Guaranteed Maximum Price)will be(increased)(decreased) <br /> (unchanged)by this Change Order in the amount of. . . . . . . . . . . . . . . . . . ... . . . . . . . .S est: 3,850.00 <br /> The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order will be . .S est: 170,700.00 <br /> The Contract Time will be(increased)(decreased)(unchanged)by thirty-one( 31 Ways. <br /> The date of Substantial Completion as of the date of this Change Order therefore is AUGUST 15,1997 <br /> NOTE: This summary does not reflect change,in the Contract Sum,Contract Time or Guaranteed Ma 11IL11n Price which h:uvc heen:uuthurized by <br /> Construction Change Directive. <br /> WILLIAMS/O'BRIEN ASSOC DKH EXCAVATING, INC. CITY OF ST.ANTHONY VILLAGE <br /> ARCHITECT CONTRACI'OR OWNER <br /> 1 Son Nicollet Mall, Suite 219 7700 HIGHWAY 101 3301 SILVER LAKE ROAD <br /> Addre>s Address Address <br /> O S MN 5 403 SHAKOPEE MN 55379 ST. ANTHONY-NN 55418-1699 <br /> BY BY Iw "� \ <br /> A E r ��� DATE r v DATE <br /> I CAUTION: You should sign an original AIA document which has this caution printed in red. <br /> An original assures that changes will not be obscured as may occur when documents are reproduced. <br /> AIA DOCUMENT G701 • CHANGE ORDER • 19H7 EDITION e AIA" • C)19H7 • THE <br /> AMERICAN INSTITUTE OF ARCIIITEc:r,, 1735 NEW YORK AVE., NAV. WASHINGTON, D.C. 31)IHA 6701-1987 <br /> WARNING:Unlicensed pi%-`•:ropyln0 violates U.S.copyright I... I Is :. ° of! !.:c:,I^.rte,^. •!tan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.