My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08121997
StAnthony
>
City Council
>
City Council Packets
>
1997
>
CC PACKET 08121997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:34:38 PM
Creation date
12/30/2015 6:34:23 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 08121997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RCM 10408.01 <br /> INTRODUCTION <br /> ' This Feasibility Report has been prepared and is submitted in accordance with an agreement between the City <br /> of St.Anthony and Rieke Carroll Muller Associates,Inc. (RCM). The report was authorized by the St.Anthony <br /> ' City Council at their regular meeting held June 9, 1997. <br /> ' The report outlines the project scope for the 1998 street and watermain improvements,as well as the estimated <br /> project costs. The streets included within this project report are: <br /> • Roosevelt Street-from 34th Avenue NE to 35th Avenue NE. <br /> 1 Edward Street-from 34th Avenue NE to 35th Avenue NE. <br /> • Harding Street-from 34th Avenue NE to 36th Avenue NE <br /> These streets were designated by City staff and RCM as the 1998 project area. The total length of all the streets <br /> ' is approximately 2750 linear feet. The project area is shown in Figure 1 on the following page. <br /> .1 <br /> r <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.