My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08121997
StAnthony
>
City Council
>
City Council Packets
>
1997
>
CC PACKET 08121997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:34:38 PM
Creation date
12/30/2015 6:34:23 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 08121997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' RCM 10408.01 <br /> C. Sanitary Sewer <br /> The existing sanitary sewers in the project area were also installed when the residential area was developed. The <br /> sewer mains are 9-inch diameter clay pipe sections approximately three feet in length. The depths range from <br /> ' 7 to 12 feet below street grade. <br /> ' Although the existing sanitary sewers appear to be in good operating condition,the City will inspect the existing <br /> sewers using televising equipment to determine the extent of repairs needed within project limits. Deficient areas <br /> should be repaired or replaced as necessary during the street and watermain construction. Repairs would consist <br /> of replacing the deteriorated pipe sections with a new PVC pipe section and rubber sleeve connections. <br /> D. Storm Sewer <br /> The project area has existing storm sewer in Harding Street between 34th Avenue NE and 35th Avenue NE. The <br /> ' storm 'sewer in the intersection of 35th Avenue and Harding Street was replaced in conjunction with the 1997 <br /> Improvements. <br /> ' The existing storm sewer has not been televised by the City staff however visual inspection at the catch basins <br /> as well as experience with the 1997 Improvement Project would indicate that some of the storm sewer,if not all, <br /> ' may need to be replaced. City staff will inspect the storm sewer to determine the extent of the repairs or <br /> replacement necessary. <br /> 1 <br /> 1 <br /> 4 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.