Laserfiche WebLink
RCM 10408.01 <br /> and abandoned The installation of the new watermain will include replacement of hydrants and valves. Existing <br /> water services will either be replaced or reconnected to the new watermain. <br /> C. Sanitary Sewer <br /> The condition of the existing sanitary sewer is unknown. The only sanitary sewer work proposed with the project <br /> ' is to repair any deteriorated sections located by City staff during their inspection and to reconstruct any manholes <br /> affected by changes in street grades.Based on previous projects of this type in this area a total length of pipe to <br /> '. be repaired is estimated at 100 lineal feet.If after viewing the tapes of the televised sewer more extensive repairs <br /> are deemed necessary we will re-evaluate the project approach and associated costs with City staff. <br /> D. Storm Sewer <br /> The proposed storm sewer improvements will include replacement of the storm sewer on Harding Street between <br /> ' 34th Avenue and 35th Avenue as well as the catch basins and manholes at the intersection of 34th Avenue and <br /> Harding Street. The replacement of the storm sewer will improve the street drainage at the intersection and <br /> ' provide outlet locations for proposed drain tle lines. The extent of the replacement will verified by City staff <br /> during project design. <br /> 1 <br /> 6 <br />