Laserfiche WebLink
RCM 10408.01 <br /> CONSTRUCTION <br /> ' Construction of the proposed street and utility project will result in inconveniences for all of the adjacent <br /> residents. However,through good communication and coordination this inconvenience can be minimized. During <br /> this project RCM will have a resident inspector available to the City and the residents to answer questions and <br /> handle complaints. The inspector is a readily available contact person whose responsibility is to help resolve <br /> problems. <br /> ' The project will also be phased so that the entire area will not be disturbed at once. The Contractor will be <br /> required to maintain one-half of the roadway during the watermain construction so that residents can still use the <br /> ' roadway. When the Contractor begins excavating the roadway,he/she will perform the work in sections so that <br /> the roadbed is backfilled and passable again at the end of each work day. <br /> Cooperation between the City,the residents,RCM and the contractor will result in another successful project for <br /> ' the City of St.Anthony. <br /> 1 <br /> 8 <br />