My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08121997
StAnthony
>
City Council
>
City Council Packets
>
1997
>
CC PACKET 08121997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:34:38 PM
Creation date
12/30/2015 6:34:23 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 08121997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RCM 10408.01 <br /> CONSTRUCTION <br /> ' Construction of the proposed street and utility project will result in inconveniences for all of the adjacent <br /> residents. However,through good communication and coordination this inconvenience can be minimized. During <br /> this project RCM will have a resident inspector available to the City and the residents to answer questions and <br /> handle complaints. The inspector is a readily available contact person whose responsibility is to help resolve <br /> problems. <br /> ' The project will also be phased so that the entire area will not be disturbed at once. The Contractor will be <br /> required to maintain one-half of the roadway during the watermain construction so that residents can still use the <br /> ' roadway. When the Contractor begins excavating the roadway,he/she will perform the work in sections so that <br /> the roadbed is backfilled and passable again at the end of each work day. <br /> Cooperation between the City,the residents,RCM and the contractor will result in another successful project for <br /> ' the City of St.Anthony. <br /> 1 <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.