Laserfiche WebLink
1 RCM 10408.01 <br /> Table 5 <br /> Total Estimated Project Costs <br /> 1 Total Estimated Street Construction Costs $461,600 <br /> Total Estimated Watermain Construction Costs 150,000 <br /> 1 Total Estimated Sanitary Sewer,Construction Costs 3,400 <br /> Total Estimated Storm Sewer Construction Costs 36,000 <br /> Total.Estimated Engineering Costs 97,500 <br /> Administrative and Legal Costs 21.500 <br /> ' Total Estimated Project Costs $770,000 <br /> 1 <br /> 1 <br /> 1 <br /> i <br /> 10 <br /> 1 <br />