My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 02241998
StAnthony
>
City Council
>
City Council Packets
>
1998
>
CC PACKET 02241998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:37:20 PM
Creation date
12/30/2015 6:37:07 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 02241998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Regular Meeting Minutes <br /> February 10, 1998 <br /> Page 5 <br /> 1 Mayor Ranallo declared the public hearing open at 7:23 P.M. <br /> 2 Bob Moberg, RCM explained that the total cost of the 1998 Street Improvement Project is <br /> 3 $700,265.17. The construction costs are $533,674.45 and the engineering and administrative <br /> 4 costs are $166,590.72. 65% of the total cost is attributable to the street construction, 25-30%to <br /> 5 the water main costs and the remainder to the sanitary storm sewer. <br /> 6 The City will pay 65% of all costs associated with the street construction. The remaining 35% <br /> 7 will be assessed to the affected homeowners. The assessment for street construction will be <br /> 8 $31.18 per lineal foot of frontage. This is $3 less than was estimated last fall at the <br /> 9 neighborhood meetings for this project. City policy is to assess the water main construction at a <br /> 10 flat fee of$400 per connection. The overall cost of the water main installation will be $191,000. <br /> 11 The 60 residents affected will be assessed$24,000 and the City will pay the remainder. <br /> 12 Of the total projects cost of$700,000, $181,000 will be assessed to property owners and the City <br /> 13 will finance the remaining $520,000 through the bonding program. <br /> 14 The anticipated schedule of the project is very similar to that of the 1997 Project on 35'Avenue <br /> 15 and Roosevelt. In that project, construction started on May 20 and between July 10 and 15 all <br /> the utility work was completed and the streets were repaved. Between July_ 15 and September 1 <br /> . 1 the restoration work was completed. <br /> 18 Mr. Moberg displayed a copy of a bulletin which RCM will distribute door-to-door during the <br /> 19 construction process. This bulletin will include updates and provide telephone numbers of <br /> 20 primary contacts for the project. <br /> 21 Ms. Kozarek asked if RCM was coordinating this project with WSB. She questioned if this <br /> 22 project was consistent with the recommendations of the Flood Task Force. <br /> 23 Mr. Moberg stated this street reconstruction project was essentially identified at about the same <br /> 24 time that the Storm Water Task Force was first forming and has proceeded somewhat <br /> 25 independently. The storm water improvements included in this project will only replace existing <br /> 26 facilities. It is expected that projects after the 1998 Project will be coordinated with WSB. <br /> 27 Ms. Kozarek suggested it would make sense economically to coordinate WSB and RCM and to <br /> 28 reassess what is being done with the storm sewer improvements. <br /> 29 Morrison stated the two firms are coordinating. WSB's report has been submitted to RCM. In <br /> 30 this case, the project was started last June. WSB did not suggest any work be done in this <br /> 31 specific project area. <br /> 2 Cavanaugh stated it was his understanding that next year's street project will be looked at in <br /> 33 relation to the WSB report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.