My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 07281998
StAnthony
>
City Council
>
City Council Packets
>
1998
>
CC PACKET 07281998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:39:52 PM
Creation date
12/30/2015 6:39:39 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 07281998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ak BA.Mirtels(eadt,P.E. <br /> 350 Westwood Lake Office Bret A.Weiss,P.E. <br /> I �� 8441 Wayzata Boulevard Peter R.Willenbring,P.E. <br /> Minneapolis, MN 55426 Donald W.Sterna,P.E. <br /> • Ronald B.Bray,P.E. <br /> 612-541-4800 <br /> &Associates,Inc. FAX 541-1700 <br /> July 21, 1998 <br /> Mr.Jay Hartman <br /> Public Works Director <br /> City of St.Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418-1699 <br /> Re: Recommendation for 1 999 Street and Watermain Improvements/Flood Mitigation Improvements <br /> City of St.Anthony <br /> WSB Project No. 1065.20 <br /> Dear Mr.Hartman: <br /> As you requested,WSB&Associates has developed a preliminary recommendation for streets to include in the <br /> 1999 Street and Watermain Improvement project. The following streets and alleys are considered key components <br /> to the implementation ofthe City's flood mitigation improvements and are hereby recommended for reconstruction <br /> in 1999: <br /> •1. 29te Avenue: Wilson Street to Crestview Drive(Minnesota State Aid Street) <br /> 2. Wilson Street: St.Anthony Blvd. to 27'h Avenue <br /> 3. Pahl Avenue: Wilson Street to Coolidge Street <br /> 4. Alley: Wilson Street to Coolidge Street(south of Murray Avenue) <br /> 5. Alley: Wilson Street to Coolidge Street(south of Pahl Avenue) <br /> 6. Alley: Wilson Street to Coolidge Street(south of St. Anthony Boulevard) <br /> 7. Silver Lake Road: 30th Avenue to 29th Avenue(Hennepin County State Aid Highway 136) <br /> In an effort to complete the feasibility report for streets at an-amount within the City budget,we have prepared the <br /> following preliminary cost estimate for the above projects using 1998 unit prices for construction: <br /> Street Improvements $785,000 <br /> Watermain Replacement $307,000 <br /> Storm Sewer Replacement $230,000 <br /> The above preliminary costs do not currently include reconstruction or,replacement of the sanitary sewer system. <br /> Should the City desire to undertake the Sanitary Sewer Feasibility Study,which is proposed as a separate project, <br /> any improvement recommended by the Sanitary Sewer Feasibility Study could be incorporated into the 1999 street <br /> •reconstruction project if you desire. <br /> Infrastructure Engineers Planners <br /> F:\WPWIM1065.20M72198 jh <br /> EQUAL OPPORTUNITY EMPLOYER <br />
The URL can be used to link to this page
Your browser does not support the video tag.