Laserfiche WebLink
Ak <br /> BA Mittelsteadt,P.E. <br /> 350 Westwood Lake Office Bra A Weiss,P.E. <br /> WS� Peter R.d W.Sterna,8441 Wayzata Boulevard g,PM <br /> Minneapolis, MN 55426 Donald W.Sterna,P.E. <br /> Ronald B.Bray,P.E. <br /> 612-541-4800 <br /> &Associates,Inc. FAX 541-1700 <br /> September 3, 199.8 - <br /> Honorable Mayor,City Council and Staff <br /> City of St.Anthony <br /> 3301 Silver Lake Road <br /> St.Anthony,MN 55418-1699 <br /> Re: Final Plans for Silver Point and Central Park <br /> WSB Project No. 1065.30 <br /> Dear Mayor,Council and Staff <br /> - <br /> Attached,please find the rough grading plans for Silver Point and Central Pads Stormwater improvements- <br /> We are continuing to work with the landscape architect,park planner and Parks Commission on the final <br /> layout of park amenities. It is anticipated that two options will be presented to the Parks Commission on <br /> September 14, 1998 and that a preliminary recommendation from the commission on the final design of <br /> Silver Point Park will be made. The Parks Commission has requested that a public informational meeting <br /> regarding the final layout of the Silver Point Park be held Any changes resulting from this meeting will be <br /> accommodated either through an addendum to the bid documents or a change order during construction. <br /> The improvement proposed for Central Park is the excavation of the area on the very north end of the park <br /> to provide five acre-feet of stormwater storage to prevent the flooding of homes during the 100 year storm <br /> event. In addition, the attached figure shows a proposed location for the stockpiling of the excavated <br /> materials from Silver Point Park It is anticipated that this stockpiled material would be used at a later date <br /> for the proposed improvements in Central Park The option of stockpiling this material in Central Park will <br /> need the approval of the School Board <br /> The estimated cost for completion of this proj ect is between$1.2 and$1.3 million. The final determination <br /> on the park configuration and the cost for amenities will impact the construction cost. Should the Council <br /> desire,this project could be advertised forbid and bids received and opened on October 7, 1998. <br /> If you have any questions,please do not hesitate to contact meat 541-4800. <br /> Sincerely, <br /> WSB&Associates,Inc- <br /> Todd E:Hubmer,P.E. <br /> �.l Project Manager <br /> nm - <br /> In Engineers Planners <br /> P.I n'PWIMI063.3010MX-lose <br /> EQUAL OPPORTUNITY EMPLOYER <br />